Laserfiche WebLink
2°4 Sewer Connection Fee. Fropan shall pay the <br /> <br />standard sewer connection fee of the City of Pleasanton, <br />payable no later than the time when building permits are issued. <br />However, at least the following payments shall be made: no <br />less thanl/7th of the total sewer connection fees from all <br />capacity allocated pursuant to paragraph 1.1 at the later of <br />(a) the date the sewer capacity is made available to the Fromm <br />business park, and (b) the end of two (2) years from the completion <br />of the formation of Assessment District; and not less than 1/7th <br />each year thereafter, with the full fee payable by ten (10) <br />years after completion of the formation of the Assessment District. <br /> <br /> 2.5 Surcharge for Industrial Capacity and Connection <br />Fees. Fromm shall pay to the City of Pleasanton the amount <br />necessary to reimburse Willow West Properties or their assigns <br />for the sewage capacity allocated to the Fromm property from <br />the capacity created pursuant to the Willow West Agreement. <br />Said payment shall be based on the formula set forth in Exhibit <br />"D", attached hereto and incorporated herein by this reference. <br />Said reimbursement shall be paid as a surcharge in addition to <br />all regular sewer connection fees required by paragraph 2.4 <br />above. The surcharge shall be paid upon issuance of building <br />permits based on a prorata share or may be paid in advance to <br />reduce carrying charges at Fromm's option. <br /> <br /> 2.6 Other Capacity. City agrees that following <br /> <br />Willow West or its assignee's posting of performance bonds for <br />completion of construction of the LAVWMA and DSRSD improvement, <br />Fromm, or its proposed assignee, may apply for and if approved, <br /> <br />-7- <br /> <br /> <br />