Laserfiche WebLink
detection/reporting/dispatching/communications <br /> recruitment/training <br /> station location <br /> apparatus <br /> staffing <br /> response procedures <br /> mutual aid <br /> multiple and simultaneous alarms <br /> hazardous materials incidents <br /> Fire Department role in general disaster preparedness <br /> fire cause investigation <br /> arson control <br /> fire incident data analysis and reporting <br /> water supply <br /> apparatus and equipment <br /> facilities <br /> <br /> COSTS <br /> <br /> potential revenue sources (e.g., general fund, <br /> fees for services, special assessments, etc.). <br /> Prepare Implementation Plan <br /> Upon selection and approval of specific alternatives <br />by the Chief of the Pleasanton Fire Department, Contractor will <br />prepare an overall implementation plan. This plan will include <br />the steps necessary to carry out and evaluate the recommended <br />programs, the responsibilities and the schedules for each <br />activity, as well as the corresponding resource requirements <br />and potential sources. <br /> <br /> B. Products <br /> <br /> The specific products to be delivered to the City of <br /> <br />Pleasanton are: <br /> <br />Work Plan (Task 1) <br />Description of Current System and Future <br />Environment (Task 2) <br />Goals and Objectives (Task 3) <br /> <br />4o Fire Protection/EMS Requirements (Task 4) <br />5. Alternative System Configurations (Task 5) <br /> 6. Implementation Plan (Task 6) - with a set of <br /> 35 mm color slides summarizing the new program. <br /> <br />-4- <br /> <br /> <br />