Laserfiche WebLink
~. <br />• Require exterior to interior noise reduction measures to reduce interior noise levels <br />Auto Mall and Retail Center <br />Require exterior to interior noise reduction techniques to reduce interior noise levels <br />Limit exterior noise levels from the auto mall car wash stations, including vacuuming <br />areas, to 60 dBA at any habitable structure on the CLC property <br />Community Park <br />Limit areas within the 65 CNEL contour to primarily open space (with limited trails) <br />and place active park uses such as playgrounds outside of the contour <br />Stoneridge Drive (by Proposed Bridge) <br />• Provide noise attenuating pavement to new portions of Stoneridge Drive (by the <br />proposed bridge) <br />Recommended mitigations require pile driving vibration to be less than the structural <br />damage threshold. Early public notices about bridge construction dates are required, as <br />well as a posted sign stating the construction date on site. A noise disturbance <br />coordinator would be appointed who would be responsible for handling complaints <br />about noise during construction. <br />Recommended traffic mitigations include requiring the payment of the City's existing <br />Traffic Development Fee or the fee update which is anticipated to be completed prior to <br />the payment of fees by this project. The improvements (e.g., new turn lanes, through <br />lanes, changing cycle length, narrowing lanes to reduce pedestrian crossing times) <br />would reduce the project's impacts to less than significant levels. The <br />Hopyard/Stoneridge signal would need to be retimed by the City. <br />Per the 2007 Cost Sharing Agreement between the cities of Pleasanton and Livermore <br />and the ACSPA, the City of Livermore is obligated to address impacts at the EI Charro <br />Road/I-580 off ramp. The agreement also provides that if this intersection is not <br />improved by Livermore then the City of Pleasanton will make the improvements. <br />The funding of the improvements required for the intersection of Stoneridge Drive/EI <br />Charm Road (in the cumulative scenario) will be included in the overall funding plan for <br />the extension of Stoneridge Drive which would be developed by the City of Pleasanton <br />at a future date. If that funding has not occurred when building permits are issued, the <br />City will be responsible for making these improvements. <br />• The recommended mitigation measures require each developer to provide a <br />construction access plan which minimizes the use of Stoneridge Drive as a construction <br />route. Measures such as notification procedures for adjacent property owners regarding <br />when major deliveries and lane closures would occur would also be required. <br />Case No. PSP-11 and PRZ-44, ACSPA Planning Commission <br />Page 6 of 8 <br />