My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
102108
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 12:13:40 PM
Creation date
10/16/2008 12:13:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/21/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Scope of Services <br />Bernal Community Park Phase 2 <br />Harris Design <br />Prepared 10/6/08 <br />Page 8 of 8 <br />• Recalculation of hydrology and hydraulics for Phase 1 and/or creek improvements <br />• Assistance with regulatory agency permit applications and/or coordination, including <br />preparation of supporting graphic, written, or mathematical information <br />• Providing professional services during the bidding and construction periods <br />• Attending additional meetings or making additional presentations in addition to those <br />specifically described in the scope of services <br />• Providing services to verify the accuracy of drawings or survey information furnished by the <br />City. <br />• Providing services ro investigate the work of separate consultants retained by City <br />• Revising drawings or other documents when the revisions are inconsistent with written or verbal <br />approvals or instructions previously given; required by the enactment or revision of codes, laws <br />or regulations subsequent to the preparation of such documents; and/or due m other causes not <br />solely within Harris Design's control <br />• Preparing perspectives, renderings, or models upon Client's request and not otherwise provided <br />herein <br />City Responsibilities <br />• Formal application For utility services <br />• Permit fees and charges <br />• CEQA and/or NEPA documentation <br />• Preparation of General Conditions and Ciry Standard front-end specifications <br />• The City will provide promptly full information regarding the requirements for the project, as <br />requested by Harris Design. <br />• The City will designate a single representative to act in its behalf relative to the project. The <br />City's representative shall examine documents submitted by Hazris Design and shall render <br />decisions pertaining thereto promptly to avoid unreasonable delay in the progress of Harris <br />Design's services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.