Laserfiche WebLink
Several mitigations are required to return this intersection to an acceptable level of service. <br />Ponderosa Homes is also required to construct a westbound free right turn lane. Staff notes that <br />the engineering plans for this improvement have been submitted to City for review. The Home <br />Depot project is conditioned to change the existing eastbound right-turn lane to an eastbound <br />through lane and re-construct the northbound free right turn lane. This improvement is shown <br />on the site plan. With these mitigations, the a.m. peak level of service is °`D" with 45.1 seconds <br />of delay and the p.m. peak hour level of service is "D" with 44.5 seconds of delay. <br />Figure 8 shows the planned street improvements to the Stanley/ValleyBcrnal intersection. <br />LOG'S <br />I~)Sryp: ~ <br />~ THE F10lfE 6EP0T <br />ac..urc ~ccwc <br />• • ~ 1 =OF.ES r._aa*uvn-x •mw•cn <br />ACS-YA[• lR`]~Of! <br />~t l fJATVCU-U1 I1~1 IC1T <br />.III I fl S1 n~ a sF <br /> <br />~~ <br />rf~Tl f"7 <br /> <br />Acld third eastbound through lane, move existing right-turn <br />receiving lane south towards the project site. No pedestrian <br />crossing will be added here due to level-of-service conflicts <br />with the p.m. peak hour traffic movement. <br />STOR'r.5 3 <br />11 rro .. <br />PA.7 <br /><r fr 3F <br />Figure 8: Stanley BoulevardNalley Avenue/Bernal Avenue Intersection Improvements. <br />As conditioned, project occupancy may not occur until the eastbound and northbound improve- <br />ments are complete and accepted by the City. <br />PCUP-165/PDR-529/PMOD-81-25-7M Puge 18 of 36 December 13, 2006 <br />