My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Several mitigations are required to return this intersection to an acceptable level of service. <br />Ponderosa Homes is also required to construct a westbound free right turn lane. Staff notes that <br />the engineering plans for this improvement have been submitted to City for review. The Home <br />Depot project is conditioned to change the existing eastbound right-turn lane to an eastbound <br />through lane and re-construct the northbound free right turn lane. This improvement is shown <br />on the site plan. With these mitigations, the a.m. peak level of service is °`D" with 45.1 seconds <br />of delay and the p.m. peak hour level of service is "D" with 44.5 seconds of delay. <br />Figure 8 shows the planned street improvements to the Stanley/ValleyBcrnal intersection. <br />LOG'S <br />I~)Sryp: ~ <br />~ THE F10lfE 6EP0T <br />ac..urc ~ccwc <br />• • ~ 1 =OF.ES r._aa*uvn-x •mw•cn <br />ACS-YA[• lR`]~Of! <br />~t l fJATVCU-U1 I1~1 IC1T <br />.III I fl S1 n~ a sF <br /> <br />~~ <br />rf~Tl f"7 <br /> <br />Acld third eastbound through lane, move existing right-turn <br />receiving lane south towards the project site. No pedestrian <br />crossing will be added here due to level-of-service conflicts <br />with the p.m. peak hour traffic movement. <br />STOR'r.5 3 <br />11 rro .. <br />PA.7 <br /><r fr 3F <br />Figure 8: Stanley BoulevardNalley Avenue/Bernal Avenue Intersection Improvements. <br />As conditioned, project occupancy may not occur until the eastbound and northbound improve- <br />ments are complete and accepted by the City. <br />PCUP-165/PDR-529/PMOD-81-25-7M Puge 18 of 36 December 13, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.