My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ With the Iron Horse Trail coming to Valley Avenue from Santa Rita Road and children <br />crossing Stanley Boulevard to go to the Shadow Cliffs location, an elevated pedestrian <br />bridge should carry biking and pedestrians traffic across the widened Stanley Boulevard <br />rather than having them cross a major arterial; <br />^ The Home Depot store still looks like a big box compared to the rest of the center. De- <br />lete the arched doors and break up the huge blank mass in front; <br />Staff needs to look into mitigation measures to address the traflc along the Valley Ave- <br />nue and Santa Rita Road area such as taking out the train over crossing to widen the un- <br />derpass on Valley Avenue. Look into traffic-calming measures for Valley Avenue - <br />adopt some of the suggestions made by the community such as installing elevated speed <br />limit signs and speed dots and moving stop signs back from crosswalks; <br />^ Define traffic routes for Home Depot commit to having their delivery trucks follow that <br />route. Direct 18 wheelers away from Sunol Boulevard and First Street and limit delivery <br />trucks for this project to major arterials such as Isabel Avenue and Stanley Boulevard and <br />away from Valley Avenue and residential streets; <br />^ book carefully into the uses for the peripheral stores and limit the list to low traftlc- and <br />parking-generating uses; <br />^ Evaluate the traffic scenario where the existing store on Johnson Drive closes down and <br />see what it does to the traffic at this location and how many vehicles would be coming <br />from the west side of town down Valley Avenue to get to Home Depot; and, <br />^ Condition the coffee place pad to preclude any fast food restaurants or a vending mecha- <br />nism for grills at that location. <br />IV. PROJECT DESCRIPTION <br />Project Description <br />Two site plans were provided in the Planning Commission's packet showing the site before/after <br />widening the Stanley Boulevard/Valley Avenue/Bernal Avenue, provided to the Planning <br />Commission for information. <br />Figure 7 on the following page is the project site plan with the widening of the Stanley Boule- <br />vard/Valley AvenueBernal Avenue intersection to mitigate the development's levels-of-service <br />impacts at this intersection. The analysis and discussion in the staff report covers this site plan <br />with the street widening. <br />PCUP-165/PDR-529/PMOD-81-25-7M Page 1 L of 36 December 13, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.