Laserfiche WebLink
C. Electrical Permit Fees <br /> ADD <br /> ADD INITIAL PLAN CHECK: <br /> When a plan is required to be submitted, the following fee is required at the 25% of Electric <br /> ADD time plans are submitted 'as needed' basis only) Permit Fee <br /> ADD (For subsequent models of same plan, a plan check fee will be collected on an ($70 minimum) <br /> ADD ADDITIONAL PLAN CHECKS: ' <br /> <br /> Plans submitted to the Building Department are assumed to be complete and <br /> ready for construction. In some cases, designers submit plans in various <br /> stages of completeness and hence a plan correction list ensues. In all cases <br /> the initial plan review fee covers the cost for the first plan review, initial Time and Material <br /> response to the first correction, and subsequent plan check only. An additional Basis <br /> charge applies to all plan check correction lists after the first one,and all newly <br /> revised, resubmitted plans. <br /> ADD <br /> ADD EXPEDITED PLAN CHECK SURCHARGE: 50% of <br /> ADD fee <br /> <br /> Original Permit $22.00 <br /> ISupplemental Permit . <br /> had not been canceled $6 50 <br /> <br /> New Residential Buildings <br /> (The following fees include all wiring, and electrical equipment in 'or on each building, or other electrical <br /> equipment on the same premises constructed at the same time. A supplemental permit issuance fee <br /> will also be collected) <br /> Single- or two-family residential buildings <br /> Not including the area of garages, carports, and other minor accessory <br /> CHANGE buildings constructed at the same time, per square foot $0.042 <br /> Multi-family (apartments and condominiums) <br /> Not including the area of garages, carports, and. other noncommercial <br /> CHANGE automobile storage areas constructed at the same time, per square foot $0.037 <br /> Other <br /> Other types of residential occupancies and alterations, additions, and (See Unit Fee <br /> ~ modifications to existing residential buildings Schedule) <br /> Private Swimming Pools <br /> For new, in-ground, swimming pools for single- and multi-family occupancies including a <br /> complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, <br /> water pumping and other similar electrical equipment directly related to the operation of a <br /> CHANGE swimming pool, each $44.25, <br /> CHANGE Carnivals, Circuses, & Electricgeneratorsand electricallydriven rides, each [_ $22.0~ <br /> Mechanically driven ridesand walk-through attractions, or <br /> <br /> CHANGE iSystem of area and booth lighting, each $6.56!.. <br /> FPerman~alJed rides, bodths, cnmmmmmmmmmmmmmmmmm~splays. a~tractiens(See Umt Fee Sched.)' <br /> Temporary Power <br /> Service, each Temporary service power pole or pedestal, including all <br /> pole or pedestal-mounted receptacle outlets and <br /> CHANGE appurtenances $22.00 <br /> Temporary distribution system and temporary lighting and <br /> receptacle outlets for construction sites, decorative light, <br /> CHANGE Christmas tree sales lots, fireworks stands, etc. $11.00 <br /> <br />effective with 1999 ordinance <br /> <br /> <br />