Laserfiche WebLink
EXKIBIT J~ <br /> <br /> TRAFFIC }~ITIGATION I}~PRO~S <br /> <br /> Estimated <br /> Improvement Cos~ <br /> <br />A. FQQchi!! Road/Canyon Way/Dublin Canyon Road <br /> <br /> 1. Widen Canyon Way between Stoneridge Mall $ 476,000 <br /> Road and Foothill Road to provide one <br /> additional westbound lane. This will <br /> provide a total of three westbound <br /> lanes. Widen on both the north and <br /> south sides of Canyon Way and <br /> reconstruct the existing median <br /> narrowing it by four feet to a width of <br /> twelve feet. The south curb will be <br /> moved six feet. The purpose is <br /> improve existing traffic flow <br /> mitigate the impact of new development <br /> by extending a very short existing <br /> right-turn lane for westbound traffic <br /> destined for the Foothill Road <br /> interchange. <br /> <br /> 2. Add a fourth northbound lane on Foothill $ 323,000 <br /> Road between Deodar Way and the <br /> northbound to eastbound ramp at the <br /> Foothill Road interchange with 1-580. <br /> This will provide two northbound lanes <br /> on Foothill Road to the ramp toward <br /> eastbound 1-580. The two lanes would <br /> transition to one lane prior to the <br /> collector-distributor road. The-other <br /> two lanes would serve the existing two <br /> lanes toward the over-crossing at 1-580. <br /> Foothill Road between Deodar Way and <br /> Canyon Way can be restriped between the <br /> existing curbs. Foothill Road between <br /> Canyon Way and the northbound <br /> eastbound ramp will require widening <br /> Foothill Road and moving the existing <br /> sidewalk back within the existing right- <br /> of-way. An additional lane will be <br /> constructed next to the existing one- <br /> lane northbound to eastbound ramp which <br /> will require Caltrans approval. The <br /> purpose of this improvemenn is <br /> provide additional capacity for the <br /> <br /> Page I of 3 <br /> <br /> EXHIBIT <br /> <br /> <br />