Laserfiche WebLink
17-Apr-97 <br /> 09:24:03 AM ~ <br /> QTR25T97 <br /> STREET PROJECTS <br /> FISCAL YEAR 1996-97 (QTR 3) <br /> TABLE 1 <br /> <br /> RECOMM FINAL <br /> CARRYOVER QTR 3 ADJUSTED <br /> ADOFrED FROM LAST YEA! ADOPTED 1996-97 BUDGET <br /> CIP~ PROJECT DESCRIPTION 1996-97 1995-96 AMENDMENTS AMENDMENTS 1996-97 <br /> <br />852034 St. John Storm Drain 30,000 30,000~ <br />885021 Pavement Manager Sofiwar~ 11,853 11,853 <br />895021 Bernal Bridge Painting 56,552 386,710 443,262 <br />905006 Main St. Pavement & Utility Reconstruction-Phase I 4,175 4,175 <br />905022 Storm Drain Extension Kottinger to Aman~ Circle 4,382 4,382 <br />915033 Hopyard Landscape Improvement-Black to DeA Vaile 32,957 32,957 <br />925021 Interim Parking-Main St. Construction 8,695 8,695 <br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho/CC CTY 606,393 606,393 <br />935028 Axroyo de la Laguna Bike Path: Arroyo DV/Pleas Canai 150,000 150,000 <br />935030 Extension of Livingston Way 12,000 12,000 <br />935043 Resurface Various City Parking LoB 35,000 35,000 <br />935045 Removal of Old Bemal Bridge Foundations 22,500 22,500 <br />945029 Extension of Junipero Street 1,169,030 1,169,030 <br />945031 Installation of New Sidewalks ! 5,490 15,490 <br />945032 Vineyard Avenue Soundwall 33,915 (1,699. 32,216 <br />945034 Arroyo Mocho Slope Repairs at Hopyard Bridge 2,192 2,192 <br />955003 Annual Resurfacing Various City StileIs 248,772 (229,37.~ 19,399 <br />955004 iAnnual Slurry Seal Project 104,520 (8,18~ 96,331 <br />955006 Annual Street Light Upgrade 10,000 10,000 <br />955027 Installation of New Sidewalks & Handicap Ramps 64,450 64,450 <br />955028 Drainage Improvements at Neal Street and Railroad Stilet 10,000 10,000 <br />965003 Annual Resurfacing Various City Streets 744,000 204,403 948,403 <br />965004 Annual Slurry Seai Project 70,000 8,189 78,189 <br />965005 Annual Traffic Loop/Pavement Replacement 20,000 20,000 <br />965006 Annual Street Lighting Upgrade 10,000 ! 0,000 <br />965007 iAnnual Traffic Button and Line Markers 25,000 25,000 <br />965020 iP!easanton Ave ReconsU' (Rose Ave - St John @ UPRR) 1996-97 388,800 (5,915~ (36,470~ 346,415 <br /> <br />965021 Bridge Painting (1996-97) 45,000 <br /> Internally Illuminated Street Signs (1996-97) 16,000! 16,000 <br />965015 ITS: Valley Ave & Paseo Santa Cruz/Via de Los Milagros (1997-98) 0 <br /> iStanley Blvd Imprnve :East of California St to Reflections (1999-00) i 0 <br />965035 iMohr Ave. Soundwall 69,000 69,000 <br />955054 Hopyard Median/Parkway Renorvation 41,068 41,068 <br />965038 Foothill Road Emergency Repairs 24,970 24,970 <br /> <br /> Partial Funding From Outside Soutees <br />965045 W. Las Positas Interchange Study 200,000 25,000 225,000 <br /> <br />945036 Santa Rim Rd Res urfacing (Rosewood - W. Las Positas) <br />945037 Rose Avenue Reconstruction (Pleasanton Ave to Fair St) 654,717 654,717 <br />945057 Hopyard Rd Rcsuffacing (Stoneridge Dr. to N. of Owens) 2,613 2,613 <br />955029 First Stn~et Bridge at Arroyo D~I Valie; Interim Improve (ISTEA/HBRR) 423,000~ 312,568 735,568 <br />965022 Hopyard Rd Resurfacing' Stonerdige Dr Affoyo Mocho (1996-97) 613,000 (170,7971 442,203 <br />965042 Main St Bridge Seismic ~etrofit ' <br /> 75,000 75,000 <br /> <br /> !100% Funding From OuIside Sources ~ <br />966001 ~Stoneridge Drive at Santa Rita lmprovemenIs -NPID 1 175,000 175,000 <br /> !Santa Rita at ValIcy; Intersection lmprovemenIs( 1996-97)-NPIDI i 0 <br />966002 :Hopyard Road at Owens Drive Channelization (1996-97) NPID I 30,000[ 30,000 <br /> Extension of Livingston Way (1998-99) 0 <br />955057 Canyon Way Widening 260,000 260,000 <br /> <br /> PARTICIPATION BY OTHER FUNDS <br /> <br /> 965020 SEWER FUND: Pleasanton Ave. Reconstruction (S147,500] 555,379 (92,121 <br /> 945029 WATER FUND: Extension of Junipero . ($43,525 ! (43,525 <br /> <br /> STREET TOTAL <br /> <br /> <br />