My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCL SUPPLEMENTAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
CITY COUNCL SUPPLEMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 11:08:59 AM
Creation date
12/26/2025 11:08:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTAL MATERIAL <br />9 <br /> <br />first two years and 8% for the last two years, uniformed water rate structure <br />and proposed water rate increase, the City estimated increase cost of $150K <br />annually for city’s consumptions and expenditures. The actual increase may <br />be less when combined with reduction of water frequency proposed through <br />the park maintenance budget reduction strategy and State water conservation <br />requirement. Once the Prop 218 process is completed and the Council has <br />approved the final rates, the budget will be updated to reflect the final revenue <br />and cost. <br /> <br />16. CIP Budget, page 77 (Sewer Lift Station): Wording such as criticality and <br />potential safety hazard was used for this project and other projects. Why is <br />funding not allocated until later years if the projects are so critical? <br /> <br />A. Staff acknowledges that several components of the City's sewer infrastructure <br />are in critical condition. However, delivery for these projects has been <br />deferred due to limited resources and competing priorities in other CIP <br />deliveries (Major projects in 2024: Water Near Term Project, Alternative <br />Water Supply, Costco Project, Hopyard Repaving Project, Water System <br />Management Plan, Water Rate Study, etc.). At present, the City is still <br />finalizing a fully developed Sewer System Management Plan (SSMP) <br />supported by a comprehensive Capital Improvement Program (CIP), which is <br />essential for identifying and prioritizing long-term infrastructure needs. <br />In response to these challenges, the City has implemented enhanced <br />operational practices and increased the frequency of maintenance activities to <br />mitigate risks and ensure continued service reliability. In 2024, an <br />independent audit was conducted to evaluate the deficiencies of the 2023 <br />SSMP and provide recommendations for improvement. <br />Staff anticipates presenting a revised and updated SSMP to the City Council <br />by June 2025, followed by a detailed CIP and Operations and Maintenance <br />Plan in Fall 2025. These foundational planning documents will inform a <br />comprehensive sewer rate study, with recommendations for revised rates <br />expected to be brought forward in Spring 2026. The updated rate structure <br />will be designed to support the implementation of the revised SSMP, including <br />the allocation of adequate resources to address critical infrastructure needs in <br />a timely and fiscally responsible manner. <br />17. The Water and Sewer (Non-General Fund) budget proposes to add several new <br />positions to support operations, deliver the capital projects identified in the Water <br />Management Plan, and meet compliance requirements. Please describe in more <br />detail the needs and how these positions will support the programs or impact <br />service levels. Please also explain if certain activities/positions can be contracted <br />out and the estimated costs.
The URL can be used to link to this page
Your browser does not support the video tag.