My WebLink
|
Help
|
About
|
Sign Out
Appendix I - Utilities and Service Systems Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix I - Utilities and Service Systems Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:03:51 PM
Creation date
12/2/2025 4:02:56 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> June 2024 6 City of Pleasanton <br />Tract 8569 (Ponderosa Homes) Hydraulic Analysis <br /> <br />Existing System Impacts: <br />• The existing system pipelines only saw a minor increase in velocities with the addition of the <br />project. No additional existing system pipeline improvements are recommended. <br />• The project will increase the storage requirement in either the Dublin Canyon or Moller 770 <br />Pressure Zone by 0.017 MG. Both pressure zones have sufficient storage capacity to meet the <br />increased requirement. <br />• The project will increase the pumping capacity requirement by approximately 23 gpm in either <br />Dublin Canyon or the Moller 770 Pressure Zone. Both pressure zones have sufficient capacity <br />for the increased requirement. <br /> <br />Sincerely, <br /> <br />AKEL ENGINEERING GROUP, INC. <br /> <br /> <br /> <br /> <br />Tony Akel, P.E. <br />Senior Principal
The URL can be used to link to this page
Your browser does not support the video tag.