My WebLink
|
Help
|
About
|
Sign Out
Appendix I - Utilities and Service Systems Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix I - Utilities and Service Systems Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:03:51 PM
Creation date
12/2/2025 4:02:56 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> June 2024 3 City of Pleasanton <br />Tract 8569 (Ponderosa Homes) Hydraulic Analysis <br /> <br />• Pipeline Velocities: The maximum pipeline velocities predicted during peak hour demands <br />are also documented on Figure 2. The proposed 8-inch mains are under the pipeline criteria <br />of 10 fps during PHDs with a maximum velocity of approximately 0.1 fps. <br />The Dublin Canyon Pressure Zone is unable to provide sufficient service pressures and fire flow <br />protection due to the elevation gain of the project. <br />Alternative 2 – Dublin Canyon Connection + Hydro-Pneumatic Pump Station Results: <br />Alternative 2 is a connection to the Dublin Canyon Pressure Zone near Dublin Canon Road and <br />Canyon Meadows Drive with a hydro-pneumatic pump station to supply the domestic water demand <br />and fire flow as documented on Figure 3. <br />• Average Day Demand Evaluation: Under average day demands, the hydraulic model <br />predicts the Project will experience service pressures of approximately 50 - 88 psi as <br />documented on Figure 3. <br />• Maximum Day Demand Evaluation: Under maximum day demands, the hydraulic model <br />predicts the Project will experience service pressures of approximately 45 ~ 84 psi as <br />documented on Figure 3. <br />• Peak Hour Demand Evaluation: Under peak hour demands, the hydraulic model predicts the <br />Project will experience service pressures of approximately 40 ~ 84 psi as documented on <br />Figure 3. <br />• Maximum Day Demand plus Fire Flow Evaluation: The fire flow analysis consisted of using <br />the MDD in the hydraulic model and applying hypothetical fire flows. The analysis indicates <br />that the proposed hydrant locations and pipelines can supply the 1,500-gpm fire flow <br />requirement. The available fire flows at a pressure greater than 20 psi are documented on <br />Figure 3. <br />• Pipeline Velocities: The maximum pipeline velocities predicted during peak hour demands <br />are also documented on Figure 3. The proposed 8-inch mains are under the pipeline criteria <br />of 10 fps during PHDs with a maximum velocity of approximately 0.1 fps. <br />The proposed hydro-pneumatic pump station will require a firm capacity of 26 gpm (1 duty + 1 <br />standby pump) to supply the domestic water demands and a 1,500 gpm fire flow pump. <br />Alternative 3 – Moller 770 Connection Results: <br />Alternative 3 is a connection to the Moller 770 Pressure Zone via a new 10-inch pipeline in the Laurel <br />Creek Emergency Vehicle Access Road and connecting to the existing system in Crosby Drive as <br />documented on Figure 4.
The URL can be used to link to this page
Your browser does not support the video tag.