Laserfiche WebLink
Table 4 Booster Station Capacity Analysis <br />Tract 8569 - Ponderosa Homes Project Hydraulic Analysis <br />City of Pleasanton <br />PRELIMINARY <br />Total Demand <br />Requirement <br />Pump Station <br />Requirement <br />(150% MDD) <br />Surplus/Deficiency <br />+/- <br />Tract 8569 Pumping <br />Requirement <br />Surplus/Deficiency with Development <br />+/- <br />(gpm)(gpm)(gpm)(gpm)(gpm)(gpm) <br />Alternative 1 and 2 Storage Analysis <br />Dublin Canyon Dublin Canyon 1,175 122 182 993 23 969 <br />Alternative 3 Storage Analysis <br />Moller 770 Laurel Creek 723 331 496 227 23 203 <br />4/5/2024 <br />Existing System Booster Station <br />Capacity Analysis <br />Booster Station <br />Capacity Analysis with Tract 8569Booster <br />Station Firm <br />Capacity <br />Pressure Zone <br />(Supplied) <br />Booster Station <br />Name(s)