My WebLink
|
Help
|
About
|
Sign Out
Appendix H - Transportation Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix H - Transportation Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:02:55 PM
Creation date
12/2/2025 3:59:37 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 2 <br />28 feet. Five-foot wide sidewalks would be constructed along the frontage of residential lots only. <br />No separation would be provided between the curb and sidewalk. <br />• East Bay Regional Park District (EBRPD) Driveway would provide motor vehicle access to the <br />EBRPD portion of the site, and lots 29 and 30, by paving an existing unpaved 16-foot wide <br />driveway and widening to a width of 28 feet with a 5-foot sidewalk on the west side. The driveway <br />would terminate at a parking lot with 20 motor vehicle parking spaces, including two ADA <br />accessible spaces. A secondary project EVA is proposed on west side of lots 29 and 30. <br />Of note, in coordination with the City, the Ponderosa Homes II, Inc. is proposing to install a traffic signal at <br />the intersection of Dublin Canyon Road and Canyon Meadows Drive as part of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.