My WebLink
|
Help
|
About
|
Sign Out
Appendix H - Transportation Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix H - Transportation Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:02:55 PM
Creation date
12/2/2025 3:59:37 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 25 <br />Table 4: Intersection Level of Service Analysis – Existing Conditions <br />ID # Intersection Control Peak Hour <br />Existing Conditions <br />LOS1 Average <br />Delay2 <br />1 Schaefer Ranch Rd & Dublin Canyon Rd Side-street stop <br />A.M. A <br /> (E) <br />7.3 <br />(39.1) <br />P.M. A <br /> (B) <br />2.6 <br />(12.5) <br />2 Proposed Street B & Dublin Canyon Rd Side-street stop A.M. n/a n/a <br />P.M. n/a n/a <br />3 Canyon Meadows Dr & Dublin Canyon Rd Side-street stop <br />A.M. A (C) 1.4 (18.1) <br />P.M. A (C) 0.9 (22.5) <br />4 Foothill Rd & Dublin Canyon Rd/Canyon Way Signal A.M. C 21.9 <br />P.M. D 44.0 <br />5 Foothill Rd & I-580 EB Ramps Signal A.M. B 12.3 <br />P.M. B 12.8 <br />6 Foothill Rd & I-580 WB Off-ramp Signal A.M. B 11.6 <br />P.M. B 17.0 <br />7 Foothill Rd & Stoneridge Dr/Laurel Creek Dr Signal A.M. B 19.5 <br />P.M. B 16.7 <br />8 Stoneridge Dr & Stoneridge Mall Signal A.M. A 5.5 <br />P.M. B 13.4 <br />9 Stoneridge Dr & I-680 SB Off-ramp Signal A.M. A 8.8 <br />P.M. B 12.6 <br />10 Stoneridge Dr & I-680 NB Off-ramp Signal A.M. B 13.1 <br />P.M. B 16.3 <br />Notes: 1. LOS – Level of Service <br />2. Delay – Whole intersection weighted average control delay expressed in seconds per vehicle for signalized and all-way stop controlled intersections. For side-street stop-controlled intersections, delay is presented for both the intersection average (and delay to the worst approach is shown in parenthesis). <br /> <br /> <br />~KM
The URL can be used to link to this page
Your browser does not support the video tag.