Laserfiche WebLink
Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 8 <br />RECOMMENDATIONS <br />The TIA identifies the following recommendations to improve site access and pedestrian connectivity: <br />EBRPD Driveway: TJKM recommends a 100-foot-long westbound left turn lane with a transition length of <br />120 feet, which exceeds the proposed dimensions shown on the site plan. <br />