My WebLink
|
Help
|
About
|
Sign Out
Appendix E - Geology and Soils Geotechnical Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix E - Geology and Soils Geotechnical Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:59:00 PM
Creation date
12/2/2025 3:58:06 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LESTER-SHRINER PROPERTY <br />132-8-2 <br />Page 1 <br /> <br /> <br /> <br /> <br /> <br /> <br />Type of Services Updated Preliminary Geotechnical & <br />Geologic Report <br />Project Name Lester-Shriner Property Residential <br />Development <br />Location Dublin Canyon Road <br /> Pleasanton, California <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION 1: INTRODUCTION <br /> <br />This updated preliminary geotechnical and geologic report was prepared for the sole use of <br />Ponderosa Homes for the Lester-Shriner Property Residential Development in Pleasanton, <br />California. The purpose of this study was to review and investigate the existing subsurface <br />conditions and develop an opinion regarding potential geotechnical concerns that could impact <br />the proposed development. The preliminary geotechnical recommendations contained in this <br />report are for your forward planning, cost estimating, and preliminary project design. For our <br />use, we were provided with the following documents: <br /> <br /> A report titled “Preliminary Geotechnical and Geologic Investigation, Lester Property <br />Residential Development, Pleasanton, CA,” prepared by Lowney Associates dated <br />March 4, 1998. <br /> Plan sheets titled, “Slope Analysis and Grading Plan, Hidden Canyon (Lester Property), <br />Pleasanton, CA, Sheets TM7-TM8” prepared by Ruggeri Jensen Azar & Associates <br />dated June 13, 2019. <br /> A site plan titled, “Overall Boundary Exhibit, Lester Property, Pleasanton, CA,” prepared <br />by Ruggeri Jensen Azar & Associates dated March 13, 2014. <br /> <br />1.1 PROJECT DESCRIPTION <br /> <br />The project site consists of two parcels located near the northwestern portion of the City of <br />Pleasanton, just south of the intersection of Dublin Canyon Road and Canyon Creek Circle. <br />The eastern portion of the Lester parcel is included in the development plan. The Shriner <br />parcel, which is located just north of the Lester parcel, is also included in the development plan. <br />The parcels have rolling hillside topography. The Shriner parcel is bordered by Dublin Canyon <br />Road to the north; the Lester parcel is flanked by Devaney Creek to the south. The Lester site <br />is currently undeveloped and has been used for cattle grazing. The Shriner parcel has a <br />IE CORNERSTONE <br />EARTH GROUP
The URL can be used to link to this page
Your browser does not support the video tag.