My WebLink
|
Help
|
About
|
Sign Out
Appendix E - Geology and Soils Geotechnical Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix E - Geology and Soils Geotechnical Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:59:00 PM
Creation date
12/2/2025 3:58:06 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LESTER-SHRINER PROPERTY <br />132-8-2 <br /> Page 20 <br /> <br />flatwork could potentially be constructed directly on finished compacted engineered fills that <br />exhibit relatively low plasticity and expansion potential. Sidewalks in public street areas should <br />be designed in accordance with City of Pleasanton design standards. <br /> <br />SECTION 9: VEHICULAR PAVEMENTS <br /> <br />9.1 ASPHALT CONCRETE <br /> <br />The following asphalt concrete pavement recommendations tabulated below are based on the <br />Caltrans Highway Design Manual (latest edition), estimated traffic indices for various pavement- <br />loading conditions, and on an assumed preliminary design R-values of 5 for roadways <br />constructed of clay fill and 30 for roadways constructed on bedrock cut or fill. The design R- <br />values were chosen based on experience with similar shallow bedrock conditions and <br />engineering judgment considering the potentially variable surface conditions that may be <br />encountered during construction. <br /> <br />Table 3: Preliminary Asphalt Concrete Pavement Recommendations (R-value = 5) <br /> <br />Design <br />Traffic Index <br />(TI) <br />Asphalt <br />Concrete <br />(inches) <br />Class 2 <br />Aggregate <br />Base* (inches) <br />Total Pavement <br />Section Thickness <br />(inches) <br />5.0 2.5 11.0 13.5 <br />5.5 3.0 12.0 15.0 <br />6.0 3.5 13.0 16.5 <br />6.5 4.0 13.0 17.0 <br />*Caltrans Class 2 aggregate base; minimum R-value of 78 <br /> <br /> <br />Table 4: Preliminary Asphalt Concrete Pavement Recommendations (R-value = 30) <br /> <br />Design <br />Traffic Index <br />(TI) <br />Asphalt <br />Concrete <br />(inches) <br />Class 2 <br />Aggregate <br />Base* (inches) <br />Total Pavement <br />Section Thickness <br />(inches) <br />5.0 2.5 7.0 9.5 <br />5.5 3.0 7.0 10.0 <br />6.0 3.0 8.0 11.0 <br />6.5 3.5 9.0 12.5 <br />*Caltrans Class 2 aggregate base; minimum R-value of 78 <br /> <br />Subgrade R-value testing should be performed during site grading to confirm the final pavement <br />design thicknesses. <br /> <br />SECTION 10: LIMITATIONS <br /> <br />This report, an instrument of professional service, has been prepared for the sole use of <br />Ponderosa Homes specifically to support the design of the Lester-Shriner Property Residential <br />15! CORNERSTONE <br />EARTH GROUP
The URL can be used to link to this page
Your browser does not support the video tag.