My WebLink
|
Help
|
About
|
Sign Out
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
102125 REGULAR
>
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 12:26:24 PM
Creation date
10/3/2025 11:15:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/21/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-08. Damages. The Contractor bears the burden of proving entitlement to and the <br />amount of any claimed damages. The Contractor is not entitled to damages calculated on <br />a total cost basis, but must prove actual damages. The Contractor is not entitled to <br />recovery of any alleged home office overhead. The Eichleay Formula or similar formula <br />may not be used for any recovery under the Contract. The Contractor is not entitled to <br />consequential damages, including home office overhead or any form of overhead not <br />directly incurred at the Worksite; lost profits; loss of productivity; lost opportunity to <br />work on other projects; diminished bonding capacity; increased cost of financing for the <br />Project; extended capital costs; non-availability of labor, material or equipment due to <br />delays; or any other indirect loss arising from the Contract. <br />7-09. Multiple Claims. In the interest of efficiency, City, acting in its sole discretion, <br />may elect to process multiple Claims concurrently, in which case the applicable <br />procedures above will be based on the total amount of such Claims rather than the <br />amount of each individual Claim. Any such election will not operate to change or waive <br />any other requirements of this Section. <br />7-10. Other Disputes. The procedures in this Section 7 will apply to any and all <br />disputes or legal actions, in addition to Claims, arising from or related to this Contract, <br />unless and only to the extent that compliance with a procedural requirement is expressly <br />and specifically waived by City. <br />Valley Avenue Soundwall Repair Project (REBID), CIP No. 18437 <br />Page 47 <br />