Laserfiche WebLink
GENERAL NOTES <br />1. ALL MATERIAL AND WORKMANSHIP SHALL FULLY CONFORM WITH THE SPECIFICATIONS, STANDARDS AND <br />ORDINANCES OF THE CITY OF PLEASANTON. STANDARD SPECIFICATIONS AND DETAILS ARE AVAILABLE AT THE <br />ENGINEERING DEPARTMENT. <br />2. THE PUBLIC WORKS DEPARTMENT (925-931-5650) SHALL BE NOTIFIED 24 HOURS PRIOR TO THE START OF ANY <br />WORK BY THE CONTRACTOR OR SUBCONTRACTORS. <br />3. THE OFFICE OF PUBLIC WORKS INSPECTION (925-931-5690) SHALL BE NOTIFIED 24 HOURS PRIOR TO THE START OF <br />ANY WORK BY THE CONTRACTOR OR SUBCONTRACTORS. <br />4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXISTENCE AND LOCATION OF ALL <br />UNDERGROUND UTILITIES. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS PRIOR TO <br />CONSTRUCTION TO FIELD LOCATE UTILITIES. CONTACT UNDERGROUND SERVICE ALERT AT 800-642-2444. ANY <br />ADDED COST ON THE PART OF THE CONTRACTOR AS A RESULT OF THE ACTUAL LOCATION OF EXISTING UTILITIES <br />BEING DIFFERENT FROM THOSE SHOWN ON THE PLANS SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED <br />INCLUDED IN THE CONTRACT UNIT PRICE. <br />5. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN <br />AUTHORIZATION FROM THE CITY ENGINEER. <br />6. CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN CONTROL INCLUDING FLAG PERSONS PER <br />SPECIFICATIONS AND SHALL SUBMIT A TRAFFIC CONTROL PLAN SUBJECT TO THE APPROVAL OF THE CITY <br />ENGINEER PRIOR TO THE START OF WORK. <br />7. ALL EXISTING UTILITIES AND PRIVATE IMPROVEMENTS THAT BECOME DAMAGED DURING CONSTRUCTION SHALL <br />BE COMPLETELY RESTORED TO THE SATISFACTION OF THE CITY ENGINEER, AT CONTRACTOR'S SOLE EXPENSE. <br />8. SAFETY MEASURES: AT ALL TIMES THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR <br />CONDITIONS OF THE JOB SITE INCLUDING SAFETY OF PERSONS AND PROPERTY, (THIS REQUIREMENT SHALL <br />APPLY CONTINUOUSLY AND NOT JUST DURING NORMAL WORKING HOURS) AND FOR ALL NECESSARY <br />INDEPENDENT ENGINEERING REVIEWS OF THESE CONDITIONS. THE ENGINEER'S JOB SITE REVIEW IS NOT <br />INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES. <br />9. THE CONTRACTOR SHALL PREPARE AND DISTRIBUTE A "GOOD NEIGHBOR LETTER" ADVISING EACH RESIDENCE & <br />BUSINESS 48 HOURS PRIOR TO BEGINNING THE WORK. <br />10. REFERENCE TO THE STATE STANDARD SPECIFICATIONS AND STANDARD PLANS MEANS THE MAY 2015 EDITIONS. <br />11. CONTRACTOR SHALL REMOVE ALL U.S.A. MARKINGS. <br />12. BACKGROUND AERIAL PROVIDED ON THE PROJECT PLANS IS FOR INFORMATION PURPOSES ONLY. <br />13. HAUL ROUTE: (AS APPROVED BY THE PROJECT INSPECTOR). <br />14. SOUND WALLS SHOWN ON PLANS ARE APPROXIMATE IN LOCATION. <br />WALL <br />1x8 <br />WOOD CLADDING DETAIL <br />Existing 2x10 Cladding <br />w/ 2x12 cap <br />(Typical) <br />REV. DATE DESCRIPTION i ADAM M. NELKIE VALLEY AVENUE SOUNDWALL REPAIR PROJECT (REBID) DESIGN: AN SCALE: NTS <br />DWG No I <br />REBID SET -� CIT 1 OF rLEASl11V 1�1V CITY ENGINEER DRAWN: SN PROTECT NO.: ClP-18437 Ci -Z <br />& NO. 78830 <br />F�� PUBLIC WORKS DEPARTMENT EXP. v/3orzs GENERAL NOTES CHECKED: AN <br />1 TRAFFIC ENGINEER: MT DATE: May 11, 2025 2 OF 8 <br />