My WebLink
|
Help
|
About
|
Sign Out
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
102125 REGULAR
>
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 12:26:24 PM
Creation date
10/3/2025 11:15:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/21/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE TO BIDDERS <br />Proposals Sought; Time for Receipt <br />Sealed Bid Proposals will be received by the City Clerk's Office of the City of <br />Pleasanton, Civic Center, in-person at 123 Main Street (or by mail to P.O. Box 520), <br />Pleasanton, CA 94566, until 11:00 a.m., September 4, 2025, for work as described in the <br />Plans and Specifications entitled: <br />VALLEY AVENUE SOUNDWALL REPAIR (REBID) <br />PROJECT NO. 18437 <br />At the above-mentioned time, date and address, the Bid Proposals will be publicly <br />opened and read. <br />Please review the City website and/or eBidboard for addendum(s) prior to submission. <br />Scope of Work and Project Location <br />This work will consist of stabilizing 6750 LF of existing precast soundwall by installing <br />1,070 new galvanized tube steel posts in cast -in -drilled hole piles. Work also includes <br />temporary support of existing panels; clearing and grubbing at post locations; connection <br />of new posts to existing concrete panels; installation of redwood cladding; sidewalk <br />removal and replacement at post locations; irrigation and planting restoration. Work shall <br />include furnishing all the labor, materials, equipment, and necessary services for <br />performing a complete project as specified in the plans and specifications. Work will also <br />include traffic control and construction area signage; providing and implementing <br />stormwater BMP's; cleaning of the job site and other miscellaneous items. Work is <br />divided into a base bid component along with two alternative bid sections of work. Basis <br />of the award will be Total Base Bid amount. Bidder must provide pricing for all base and <br />alternative items for bid to be considered responsive. <br />The Engineer's cost estimate for the project, including bid alternatives, is $2,400,000. <br />Copies of Plans and Specifications <br />In order to be an eligible bidder, plans, specifications and all bid proposal and contract <br />documents must adhere to the latest version of all bid documents as amended through any <br />addendums. Plans may be purchased from the Engineering Division of the City of <br />Pleasanton, Civic Center, 200 Old Bernal Avenue, at a cost of $30 per set plus shipping. <br />Plans will be electronically available on the City's website and Bidnetdirect.com at no <br />charge. The City requests all parties interested in this bid opportunity to email the City to <br />be added to the plan holder list. Any addenda will be sent electronically to those on the <br />plan holder list prior to the bid opening date. To request plans or to be added to the plan <br />holder list, please email: <br />Valley Avenue Soundwall Repair Project (REBID), CIP No. 18437 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.