My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Note that the fill from Danville and Sunnyvale cover over the Busch Pond and sediment which <br />from residents were previously runoff from Pleasanton Garbage company. The first, layer of <br />import soil came from the Danville Site, and the upper layer (~18,000 cu. Ft.) came from <br />Sunnyvale and was documented by Haley-Aldric to contain extremely hazardous contaminants. <br /> <br />It is known that, after multiple complaints from residents to Alameda County Vector Control <br />about mosquitos breading in the water there, the pond area was filled in with the soil instead <br />of using their specified tablets to kill the mosquito larva. The fill destroyed the pond which had <br />been utilized for decades by seasonal migrating birds. (in AOC 6) <br /> <br />In addition, the fill also was on Policy 126 of the East County Area Plan, and was apparently <br />filled in with imported material. The prior seasonal wetland was listed as PUBHx on the <br />National Wetlands Inventory which would be impacted by such removal from this property. <br />It a riparian and seasonal wetland and should in no way have been removed by the <br />responsible party. In that it actually was filled in, apparently without proper authority, this <br />should create a plan of remedial action and no property should be allowed to be built on this <br />wetland location. <br /> <br />Thank you for your consideration, and in particular re-consideration for elderly citizens who <br />have reduced tolerance and more likely harmful impact resulting from the proposed Arroyo <br />Lago development. We would not want to be occupants of this proposed development with <br />its history of contaminants, industrial runoff, and sediments which might cause lane shifting <br />and health hazards. <br /> <br />Sincerely, Carol Olson <br />1350 Chatham Court <br />Pleasanton, CA 94566 <br /> <br />App F p 6409 App F p 6410 <br />The maps here <br />from Appendix F <br />of the Draft EIR <br />show the <br />locations of the <br />soil fill from <br />Danville (2 ft , <br />ave. 9””and <br />Sunnyvale ( 2.5 <br />ft., ave 8”).
The URL can be used to link to this page
Your browser does not support the video tag.