My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
041525
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:30:15 PM
Creation date
4/24/2025 10:20:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EFFECTIVE DATE: March 5, 2025 <br />BUILDING PERMIT QUESTIONNAIRE <br />This questionnaire needs to be completed and included with the plan check package submitted to the <br />Building and Safety Division when filing for a building permit online for the project described below. Its <br />purpose is to ensure the plans are checked in a timely manner and the project is built according to the <br />approved plans. We appreciate your cooperation and if you have any questions, please contact the Planning <br />Division at (925) 931-5600 /
[email protected]
. <br />1. Applicant's Name and Address: <br />Guy Houston, California Gold Advocacy Group, 6300 Village Parkway, Suite 200, Dublin, CA 94568 <br />2. P24-0732, Project Address: 4212 First Street <br />3. Description of the project for which a permit is being requested: <br />Install new monument, wall, and canopy signage as part of a gas station rebranding for Gulf <br />Gas Station <br />4. Do you certify that the plans submitted for issuance of building permits conform in every respect to <br />the approved plans and to all conditions of approval? _YES NO <br />5. If the answer to question No. 6 is `NO,' please list every item on the building permit plans which <br />differs from the approved plans or conditions of approval. Use the reverse side or attach additional <br />sheets if necessary. All changes to the approved plans should be clouded with delta numbers (0). <br />I hereby attest the above is true and correct. I understand that failure to correctly answer these questions <br />may result in a delay of issuance of building permits and if changes are discovered after the permit is issued, <br />I am responsible for revising the project to conform to the plans approved through the Planning Division. <br />Date <br />Signature <br />Phone Number <br />Email <br />
The URL can be used to link to this page
Your browser does not support the video tag.