<br /> • Estimated Cost($20241 ( Cost Included in TIE Program
<br /> Roadway Intersection/ men[ hn Existing Deficiency? Percent Eligible for Explanation of Percent Pleasanton Percent Pleasanton
<br /> y Sag Vrnven�.-eu "g ry Foe Program Eligibility I Trips,from Model Trips,Adjusted
<br /> Low High 1 , Minimum I Maximum
<br /> Update bridge railing to meet Caltrans
<br />' 64 Val Vista Bridge Improvements Val Vista Community Park Trail&Arroyo de la I aguna standards $140,000 $140,000 18% $25,201 $25,200
<br /> East bank''
<br /> 65 Arroyo de la Laguna Arroyo Mocho to Arroyo del Valle 10 foot paved bikeway $1,870,000 $2,990,000 18% $336,600 S538,200
<br /> Compacted soil/decompressed granite side
<br /> path for pedestriaMmnner/equestrian use
<br />•
<br /> Access gale and pathway trom north side of
<br /> 66 W Las Positas/Arroyo de la I aguna Trail Access Point Arroyo de la I aguna to W I as Positas W Las Positas Road 3170,000 1170000 18% $30,600 $30,600
<br />• 10 foot paved bikeway
<br />• Compacted soil/decompressed granite side
<br /> path for pedestrian/runner/equestrian use
<br /> Requires new b ke/ped bridge at)unction of
<br /> 67 Arroyo de la Laguna Trail-South Extension Arroyo del Valle to near south end of Laguna Creek Lane Arroyo del Valle Intersection improvements at $3.070,000 $3.070,000 18% $552,600 $552,600
<br /> Bernal Ave,Potential access points at
<br /> Lylewood Drive,Bernal Avenue,and along •
<br /> Laguna Creek lane
<br /> Change bridge railing to meet Caltrans
<br /> 68 Pleasanton('anal Bridge Improvements Alamo Canal Trail to Pleasanton Canal standards,SS'height $110,000 1110.000 18% 119,800 $19,800
<br /> 10 foot paved bikeway
<br /> Compacted soil/decompressed granite side
<br /> •
<br /> path for pedestrian/runner/equestrian use •
<br /> Owens Drive/Dublin-Pleasanton BART Station to W Las Positas Intersection Improvements at W Las Positas,
<br /> 69 Chabot Canal Boulevard/Arroyo Macho Trail Inglewood,Stoneridge,Gibraltar,Ovens. $6,000,000 16,000000 18% • $1,080,000 $1,080,008
<br /> Requires bridge at Arroyo Mocho.Provides
<br /> between Arroyo Mocha Trail and Dublin-
<br />• Pleasanton BART,and Hart Middle School
<br /> (Constrain;multiple mid-block crossings) •
<br /> Iron Horse Trail,intersection/Vail crossing and
<br /> signage improvements are needed;this area
<br /> • •
<br /> 70 Iron Horse Trail Between Stoneridge Drive and Santa Rita Road includes the Drive
<br /> intersection th of W Las Positas with $2,3Fs0,0o0 $4,120,000 18% $424,800 $741,600
<br /> Stoneridge Drive and the Arroyo Mocho Trail - '
<br /> with the Iron Horse Trail Corridor;construct •
<br /> •
<br /> • bridge across Arroyo Mocho Trail •
<br /> •
<br /> 10 toot paved bikeway
<br /> Compacted soil/decompressed d granite side pres a
<br /> • path for pedestrian/runner/equestrian use I
<br /> 71 Iron Horse Trail Busch Road to Stanley Boulevard from Busch Road,to Stanley Boulevard al 312,360,000 $12,360,000 I 18% $2,224,800 $2,224,800
<br /> Shadow Cliffs Regional Park Entrance.
<br /> Intersection/trail crossings improvements at
<br /> Busch Road and Valley/Stanley intersection,
<br /> • and railroad crossing •
<br /> 5