Laserfiche WebLink
• <br /> • Estimated Cost($20241 ( Cost Included in TIE Program <br /> Roadway Intersection/ men[ hn Existing Deficiency? Percent Eligible for Explanation of Percent Pleasanton Percent Pleasanton <br /> y Sag Vrnven�.-eu "g ry Foe Program Eligibility I Trips,from Model Trips,Adjusted <br /> Low High 1 , Minimum I Maximum <br /> Update bridge railing to meet Caltrans <br />' 64 Val Vista Bridge Improvements Val Vista Community Park Trail&Arroyo de la I aguna standards $140,000 $140,000 18% $25,201 $25,200 <br /> East bank'' <br /> 65 Arroyo de la Laguna Arroyo Mocho to Arroyo del Valle 10 foot paved bikeway $1,870,000 $2,990,000 18% $336,600 S538,200 <br /> Compacted soil/decompressed granite side <br /> path for pedestriaMmnner/equestrian use <br />• <br /> Access gale and pathway trom north side of <br /> 66 W Las Positas/Arroyo de la I aguna Trail Access Point Arroyo de la I aguna to W I as Positas W Las Positas Road 3170,000 1170000 18% $30,600 $30,600 <br />• 10 foot paved bikeway <br />• Compacted soil/decompressed granite side <br /> path for pedestrian/runner/equestrian use <br /> Requires new b ke/ped bridge at)unction of <br /> 67 Arroyo de la Laguna Trail-South Extension Arroyo del Valle to near south end of Laguna Creek Lane Arroyo del Valle Intersection improvements at $3.070,000 $3.070,000 18% $552,600 $552,600 <br /> Bernal Ave,Potential access points at <br /> Lylewood Drive,Bernal Avenue,and along • <br /> Laguna Creek lane <br /> Change bridge railing to meet Caltrans <br /> 68 Pleasanton('anal Bridge Improvements Alamo Canal Trail to Pleasanton Canal standards,SS'height $110,000 1110.000 18% 119,800 $19,800 <br /> 10 foot paved bikeway <br /> Compacted soil/decompressed granite side <br /> • <br /> path for pedestrian/runner/equestrian use • <br /> Owens Drive/Dublin-Pleasanton BART Station to W Las Positas Intersection Improvements at W Las Positas, <br /> 69 Chabot Canal Boulevard/Arroyo Macho Trail Inglewood,Stoneridge,Gibraltar,Ovens. $6,000,000 16,000000 18% • $1,080,000 $1,080,008 <br /> Requires bridge at Arroyo Mocho.Provides <br /> between Arroyo Mocha Trail and Dublin- <br />• Pleasanton BART,and Hart Middle School <br /> (Constrain;multiple mid-block crossings) • <br /> Iron Horse Trail,intersection/Vail crossing and <br /> signage improvements are needed;this area <br /> • • <br /> 70 Iron Horse Trail Between Stoneridge Drive and Santa Rita Road includes the Drive <br /> intersection th of W Las Positas with $2,3Fs0,0o0 $4,120,000 18% $424,800 $741,600 <br /> Stoneridge Drive and the Arroyo Mocho Trail - ' <br /> with the Iron Horse Trail Corridor;construct • <br /> • <br /> • bridge across Arroyo Mocho Trail • <br /> • <br /> 10 toot paved bikeway <br /> Compacted soil/decompressed d granite side pres a <br /> • path for pedestrian/runner/equestrian use I <br /> 71 Iron Horse Trail Busch Road to Stanley Boulevard from Busch Road,to Stanley Boulevard al 312,360,000 $12,360,000 I 18% $2,224,800 $2,224,800 <br /> Shadow Cliffs Regional Park Entrance. <br /> Intersection/trail crossings improvements at <br /> Busch Road and Valley/Stanley intersection, <br /> • and railroad crossing • <br /> 5 <br />