My WebLink
|
Help
|
About
|
Sign Out
ORD 2285
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:20:43 AM
Creation date
9/3/2024 9:09:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />E. Water Connection Fees - City <br />For each single family house, or any other use that is determined by the City Engineer or the Engineer's duly appointed representative to <br />have a water demand equivalent to that of a single-family house, for normal domestic -type water uses only, there shall be a connection <br />fee charged for each service connection as indicated in the following table. This shall be the minimum charge for all uses. For all <br />other uses, for each service connection, a charge shall be made as established in the following table depending on the size of the meter <br />required for that service connection as determined by the City Engineer or his duly appointed representative <br />Amounts DO NOT include water meter <br />installation fees, which are revised periodically <br />based on current costs for labor & materials as <br />authorized in Section B "Water Meter & <br />Installation Fees". <br />N. Pleasanton All Other Service <br />Meter Size Improvement Dist 2B Connections <br />5/8 inch (displacement type) $460 $1,200 <br />3/4 inch (displacement type) $690 $1,800 <br />1 inch (displacement type) $1,150 $3,000 <br />1 5 inch (displacement type) $2,300 $6,000 <br />2" (displacement type) $3,680 $9,600 <br />2" Mueller MVR $5,290 $13,800 <br />-2" (OMNI C2) $7,360 $19,200 <br />3 inch (OMNI C2) $8,050 $21,000 <br />4 inch (OMNI C2) $23,000 $60,000 <br />6 inch (OMNI C2) $46,000 $120,000 <br />8 inch (OMNI C2) $80,5001 $210,000 <br />10 inch (OMNI C2) $126,5001 $330,000 <br />For any larger service connection, the City Engineer or his duly appointed representative will determine the charge; or <br />a battery of meters may be used at the City Engineer's option. <br />Any change in use or addition requinng greater capacity will require the payment of additional fees at the rates <br />established herein as a condition of continued service <br />F. Recycled Water Connection Fees <br />Res 15-777, Adjusted annually beginning 1 <br />January 2017 by Engineering News Record <br />(ENR) Construction Cost Index. <br />Meter Size <br />Meter <br />Equivalent <br />Recycled Water <br />Connection Fee <br />5/8 inch 1.00 <br />$19,299 <br />3/4 inch 1.50 <br />$28,949 <br />1 inch 2.50 <br />$48,253 <br />1.5 inch (displacement type) 5.00 <br />$96,497 <br />1.5 inch (OMNI C2) 16.00 <br />$308,789 <br />1.5 inch (OMNI T2) 16.00 <br />$308,789 <br />2" (displacement type) 8.00 <br />$154,395 <br />2" (OMNI C2) 16.00 <br />$308,789 <br />2" (OMNI T2) (1) 20.00 <br />$385,987 <br />IX. Water: 31 of 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.