Laserfiche WebLink
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />Administrative Cost Recovery <br />Current fees <br />effective 7/01/22 <br />Interactive Voice Recording (IVR) fee <br />$10 <br />Returned Check Fee <br />$25 <br />Hydrant Meter Deposits <br />3/4' (long) Diehl $477.83 3" EVO Q4 <br />Potable Water Hydrant Meter Deposit <br />1" Kamstru p $613.37 4" EVO Q4 <br />3/4" Hydrant Meter & Backflow Assembly <br />$1 500 <br />3" Hydrant Meter & Backflow Assembly <br />$4,000 <br />Recycled Water Hydrant Meter Deposit <br />$14.91 <br />3" Recycled Hydrant Meter <br />$2,500.00 <br />Residential Construction Water Unit Cost <br />$3.45 <br />For units that will be individually metered <br />$25 <br />B. Water Meter & Installation Fees <br />Eff. 07.01.2022 <br />The Director of Operations and Water Utilities, or designee, shall publish periodically the fees or fee formula for water service installation <br />by the City The published fee or formula shall reflect the estimated actual cost to the City <br />Current fees <br />effective 7/01/22 <br />Meter SEeFee <br />Meter Size <br />ee <br />3/4" (short) Diehl $452.99 Kamstrup (IT' lay length) <br />$1,225.10 <br />3/4' (long) Diehl $477.83 3" EVO Q4 <br />$3,431.31 <br />1" Kamstru p $613.37 4" EVO Q4 <br />$3.977.47 <br />1 112" Kamstrup $1,036.40 6" EVO Q4 <br />$6.924.99 <br />2" Kamstrup(151/4"lay length) $1,167.87 8" EVO Q4 <br />$9,861.51 <br />C. Water Drought Water Shortage Rates'') <br />Eff. 01.01.2024 <br />Drought/ivater shortage rates are added to the current rates shown in Section A, at the time the drought state is declared <br />Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 <br />Stage 6 <br />Single Family <br />Exceed 1 <br />Exceed 2 <br />Exceed 3 <br />Exceed 4 or more <br />Stage <br />0 - 20 Ccf <br />$0.64 <br />$1.60 <br />$2.95 <br />$5.28 <br />$9.92 <br />$14.91 <br />21 - 40 Ccf <br />$0.75 <br />$1.86 <br />$3.45 <br />$6.16 <br />$11.58 <br />$17.41 <br />41 - 60 Ccf <br />$0.81 <br />$2.02 <br />$3.73 <br />$6.67 <br />$12.54 <br />$18.84 <br />over 60 Ccf <br />$0.84 <br />$2.10 <br />$3.89 <br />$6.96 <br />$13.08 <br />$19.66 <br />Multi -Family <br />$0.64 <br />$1.59 <br />$2.94 <br />$5.26 <br />$9.89 <br />$14.85 <br />Commercial <br />$0.65 <br />$1.63 <br />$3.01 <br />$5.38 <br />$10.12 <br />$15.21 <br />Industrial <br />$0.65 <br />$1.63 <br />$3.01 <br />$5.38 <br />$10.12 <br />$15.21 <br />Irrigation <br />$0.75 <br />$1.8TI <br />$3.461-$6.18 <br />5 <br />$11.62 <br />$17.46 <br />(2) - Rate payers will be notified 30 days prior to any increase taking effect. <br />$24 additional for all <br />$32 additional for all <br />D. Water Conservation Plan- Excess use penalties PMC 9.30 100 <br />Water usage in excess of the amount provided in Section 9.30 070 is subject to the following penalties: <br />Additional penalties for multiple times exceeding water use amount are for the number of times within the prior 12 months <br />Exceed 1 <br />Exceed 2 <br />Exceed 3 <br />Exceed 4 or more <br />Stage <br />Overall Reduction <br />time <br />times <br />times <br />times <br />1 <br />Up to 10% Voluntary <br />no penalty <br />no penalty <br />no penalty <br />no penalty <br />2 <br />Up to 20% Voluntary <br />no penalty <br />no penalty <br />no penalty <br />no penalty <br />2 <br />Up to 20% Mandatory <br />$2.50 additional for <br />$5 additional for all <br />$7.50 additional for <br />$10 additional for all <br />all units <br />units <br />all units <br />units <br />3 <br />Up to 30% Mandatory <br />$4 additional for all <br />$8 additional for all <br />$12 additional for all <br />$16 additional for all <br />units + $50 <br />units + $100 <br />units + $250 <br />units + $500 <br />4 <br />Up to 40% Mandatory <br />$6 additional for all <br />$12 additional for all <br />$18 additional for all <br />$24 additional for all <br />units + $100 <br />units + $250 <br />units + $500 <br />units + $750 <br />5 <br />Up to 50% Mandatory <br />$8 aMiVdaWrfd39a8f <br />5916 additional for all <br />$24 additional for all <br />$32 additional for all <br />units + $150 <br />units + $300 <br />units + $550 <br />units + $800 <br />