My WebLink
|
Help
|
About
|
Sign Out
ORD 2285
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:20:43 AM
Creation date
9/3/2024 9:09:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />IV. BUILDING AND SAFETY DIVISION <br />A. Building Permit Fees PMC 20.04.015 <br />=ff 01.01.2024 <br />VALUATION SCHEDULE <br />CONSTRUCTIONNEW ADDITIONS <br />Total Project Valuation <br />- Commercial &Industrial Buildings <br />Permit Valuation shall be determined by the New Construction <br />$1 -$1,000 <br />Valuation Table of the Building Division in effect at the date of <br />Unless specified elsewhere, applicable to permitted projects subject to <br />application, or as otherwise determined by the Building and <br />- Dwellings <br />Safety Official. The Table shall be revised annually on <br />$2,001 - $25000 <br />January 1 by the percentage increase or decrease in the <br />- Garages & Accessory Structures <br />Engineering News Record Construction Cost Index (CCI) for <br />$555 <br />the San Francisco Bay Area. <br />ALTERATIONS & REPAIRS <br />$900 <br />- Remodels, Repairs, Reroofs, Tenant Improvements, <br />Contract price of the work being performed, or as otherwise <br />etc. <br />determined by Building and Safety Official. <br />BASIC FEE <br />SCHEDULE <br />Total Project Valuation <br />Base Fee <br />Plus <br />$1 -$1,000 <br />$120 <br />Unless specified elsewhere, applicable to permitted projects subject to <br />$1,001 - $2,000 <br />$145 <br />25% of Building Permit Fee <br />$2,001 - $25000 <br />$180 <br />$16.30 for each additional $1,000 (or fraction thereof) <br />up to and including $25,000. <br />$25,001 - $50,000 <br />$555 <br />$13.80 for each additional $1,000 (or fraction thereof) up <br />to and including $50,000. <br />$50,001 - $100,000 <br />$900 <br />$9.70 for each additional $1,000 (or fraction thereof) up <br />to and including $100,000. <br />$100,001 - $500,000 <br />$1,385 <br />$7.99 for each additional $1,000 (or fraction thereof) up <br />to and including $500,000. <br />$500,001 - $1,000,000 <br />$4,580 <br />$6.38 for each additional $1,000 (or fraction thereof) up <br />to and including $1,000,000. <br />$1,000,001 and above <br />$7,770 <br />$5.55 for each additional $1,000 (or fraction thereof) <br />PERMIT SURCHARGES <br />Unless specified elsewhere, applicable to all projects with multi -trade <br />construction being performed in conjuction with a building permit. <br />25% of Building Permit Fee <br />TITLE -24 ENERGY SURCHARGE <br />Unless specified elsewhere, applicable to permitted projects subject to <br />compliance with Title 24, Part 6, The California Energy Code <br />25% of Building Permit Fee <br />ACCESSIBILITY SURCHARGE <br />Applicable to plan review of all projects requiring compliance with State of <br />California Accessibility, FHAA and/or ADA Requirements. <br />15% of Building Permit Fee <br />GREEN BUILDING SURCHARGE <br />For all permits requiring compliance with California Green Building Standards <br />(Includes Waste Management Fee). <br />15% of Building Permit Fee <br />S_WPPP(STORM WATER)_ SURCHARGE <br />For all covered projects requiring on-site stormwater treatment or pre - <br />treatment. <br />15% of Building Permit Fee <br />REVIEW <br />NG PLAN REVIEW FEE 175% of Permit Fees. One-hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.