|
FIRSTCARBON
<br /> Audi i luiv
<br /> PHILIP AULT, MS—NOISE SPECIALIST
<br /> OVERVIEW
<br /> • 11 years of experience
<br /> Education
<br /> • Master of Science,Advanced Environmental and Energy Studies for Architecture, University of East
<br /> London at Center for Alternative Technology,Wales,UK, 2007
<br /> • Bachelor of Science,Mathematics,Bob Jones University,Greenville,SC, 1991
<br /> Professional Affiliations
<br /> • Associate Member,Institute of Noise Control Engineering
<br /> • AEP
<br /> Training and Certifications
<br /> • USGBC, LEED-AP,without specialty
<br /> • TRAFFIX Training,Dowling Associates,Inc.,Oakland,CA
<br /> • FHWA Traffic Noise Model(TNM)2.5 and Traffic Noise Fundamentals Training Course,Bowlby&
<br /> Associates,Inc., Franklin,TN
<br /> • Principles of Ecological Design,Case Studies in Ecological Design,San Francisco Institute of
<br /> Architecture San Francisco,CA
<br /> Philip Ault,MS,has more than 11 years of experience in noise and air quality environmental impact
<br /> analysis.He is proficient with the use of the FHWA Highway Traffic Noise Prediction Model(FHWA RD-
<br /> 77-108),SOUND32 noise model,FHWA TNM 2.5,and SoundPLAN 7.4(a 3-D noise mapping computer
<br /> modeling program).He conducts field noise measurements with the Larson Davis LxT,720,820,and 824
<br /> models and the Extech 407780 model sound level meters in compliance with FHWA,FTA,and HUD
<br /> standards. Mr.Ault prepares stand-alone noise and air quality studies,as well as studies in compliance
<br /> with CEOA and NEPA requirements. He has prepared CEQA analyses for programmatic documents,
<br /> including general plans,general plan updates,and specific plans,and he provides peer review and
<br /> expert testimony noise services. Mr.Ault has conducted extensive research in environmental and
<br /> energy topics,including energy-efficient project design,sizing of wind and solar PhotoVoltaic hybrid
<br /> generator systems,and project GHG emission impacts related to global climate change. He has also
<br /> conducted extensive research into LEED for Neighborhood Developments,a tool developed by the
<br /> USGBC as a standard for sustainable community design and development,and how such tools can blend
<br /> with CEQA requirements.
<br /> RELATED EXPERIENCE AND CLIENT SUMMARY
<br /> Environmental Impact Report for the Spotomo Residential Subdivision Project,City of Pleasanton,C4
<br /> FCS is currently preparing an EIR,technical studies/analyses,and related documents for a 39-lot
<br /> residential subdivision in the Happy Valley area of Pleasanton.The project applicant(Tim Lewis
<br /> Communities)is proposing to rezone and subdivide the project site to support 39 single-family
<br /> residential lots and roadways on the 31-acre Spotorno Flat portion of the site and permanently preserve
<br /> acreage as open space.A public trail would be constructed along the Westbridge Lane frontage and the
<br /> www.FirstCarbonSolutions.com CORPORATE RESUME
<br />
|