Laserfiche WebLink
20.26.360 <br />(Pleasanton Supp. No. 29, 1-23) 814 <br />3. Raceway(s) or busway(s) originating at a <br />main service panel or a subpanel(s) serving <br />the area where potential future medium- and <br />heavy-duty EVSE will be located, and shall <br />terminate in close proximity to the potential <br />future location of the charging equipment <br />for medium- and heavy-duty vehicles. <br />4. The raceway(s) or busway(s) shall be of suf- <br />ficient size to carry the minimum additional <br />system load to the future location of the <br />charging for medium- and heavy-duty EVs <br />as shown in Table 5.106.5.4.1.1. <br />(Ord. 2241 § 2, 2022) <br /> <br />20.26.360 Table 5.106.4.1.1 added—Raceway and <br />panel power requirements for <br />medium- and heavy-duty EVSE. <br /> Tables 5.106.4.1.1 is added to read as follows: <br /> <br /> <br />TABLE 5.106.5.4.1.1, Raceway Conduit and Panel power Requirements for Medium-and-Heavy-Duty EVSE <br /> <br />Building type Building Size (sq. ft.) Number of Off-Street Loading <br />Spaces <br />Additional Capacity Required ( kVa) <br />for Raceway & Busway and <br />Transformer & Panel <br />1 or 2 200 10,000 to 90,000 3 or Greater 400 Grocery <br />Greater than 90, 000 1 or Greater 400 <br />1 or 2 200 10,000 to 135,000 3 or Greater 400 Retail <br />Greater than 135,000 1 or Greater 400 <br />1 or 2 200 20,000 to 256,000 3 or Greater 400 Warehouse <br />Greater than 256,000 1 or Greater 400 <br /> <br />(Ord. 2241 § 2, 2022) <br /> <br />20.26.370 Section 5.106.13 added—All-electric <br />buildings. <br /> Section 5.106.13 is added to read as follows: <br /> <br />5.106.13 All-electric buildings. New construction <br />buildings and qualifying alteration projects shall <br />comply with Section 5.106.13.1 or 5.106.13.2 so <br />that they do not use combustion equipment or are <br />ready to facilitate future electrification. <br /> <br />5.106.13.1. New construction and qualifying al- <br />teration projects. All newly constructed buildings <br />shall be all-electric buildings. Alterations that in- <br />clude replacement of over 50 percent of the exist- <br />ing foundation for purposes other than a repair or <br />reinforcement as defined in California Existing <br />Building Code Section 202; or where over 50 per- <br />cent of the existing framing above the sill plate is <br />removed or replaced for purposes other than re- <br />pair, shall be all-electric buildings. If either of <br />these criteria are met within a three-year period, <br />measured from the date of the most recent previ- <br />ously obtained permit final date, the project shall <br />be subject to the all-electric buildings require- <br />ments. <br /> <br />Tenant improvements shall not be considered new <br />construction. The final determination whether a <br />project meets the definition of substantial recon- <br />struction/alteration shall be made by the local en- <br />forcing agency. <br />