Laserfiche WebLink
Mike Tassano December 6, 2022 <br />Page 46 of 39 <br />In the Existing plus Approved Projects scenarios, four study intersections were found to operate <br />below the city’s LOS standards. Appropriate improvements were identified for some, but not all <br />these locations. The construction of the El Charro Road extension project would improve <br />operations at many locations in the Existing plus Approved Project scenario, particularly those <br />along the Santa Rita Road corridor. <br />In the Cumulative baseline scenario six study intersections were found to operate below the city’s <br />LOS standards. The addition of traffic associated with the Housing Element sites would result in <br />an additional three failing intersections, with conditions degraded further at the six intersections <br />operating poorly in the Cumulative baseline scenario. In all scenarios, the addition of project <br />traffic would result in the exacerbation of existing queueing issues at some locations and the <br />introduction of new queueing issues at additional intersections. <br />Attachments: <br />Attachment A: LOS Calculation Worksheets <br />Attachment B: 95th Percentile Queue Summary Attachment C: Queue Calculation Worksheets <br /> <br />