Laserfiche WebLink
In addition, the fire-sprinkler system shall be designed and sprinklers shall be installed in the <br /> following additional locations: <br /> 1. Attic shall be provided intermediate temperature-rated residential fire sprinklers for <br /> detection coverage and located at a spacing equivalent to 30 feet by 30 feet centers and <br /> maximum of 15 feet from outside walls. <br /> 2. Fire sprinklers shall be provided in garages. Fire sprinklers shall be intermediate rated, <br /> quick response, with a maximum coverage of 130 square feet per sprinkler. <br /> 20.24.190 CFC Section 5001.5.3 added — Hazardous Materials Management Plan and <br /> Hazardous Materials Management Plan Maintenance <br /> Section 5001.5.3 is added as follows: <br /> 5001.5.3 Hazardous Materials Management Plan and Hazardous Materials Management <br /> Plan Maintenance. Hazardous Materials Management Plans (HMISs) and Hazardous Materials <br /> Management Plans (HMMPs) shall be modified and resubmitted when substantive changes occur <br /> and defined in the California Health and Safety Cope for Hazardous Materials Business Plans. <br /> Whether or not substantive changes have occurred, Hazardous Materials Management Plans <br /> (HMISs) and Hazardous Materials Management Plans (HMMPs) shall be resubmitted no later <br /> than 12 months from the last submittal date. <br /> Exception: HMISs and HMMPs for unstaffed utility sites that are under the reporting threshold for <br /> the federal Emergency Planning and Community Right-to-Know Act (EPCRA) shall be <br /> resubmitted no later than 36 months after the latest submittal. <br /> 20.24.200 CFC Section 5003.2.10 added — Biodiesel and methanol equipment. <br /> Section 5003.2.10 is added to read: <br /> 5003.2.10 Biodiesel and methanol equipment. Biodiesel and methanol <br /> manufacturing/processing equipment shall be listed or approved. Such equipment shall at a <br /> minimum adequately address electrical system, materials of construction, ventilation, seismic and <br /> process control and shut-down safety issues. <br /> 20.24.210 CFC Section 5003.5.2 added — Ventilation ducting. <br /> Section 5003.5.2 is added to read: <br /> 5003.5.2 Ventilation ducting. Product conveying ducts for venting hazardous materials <br /> operations shall be labeled with the hazard class of the material being vented and the direction of <br /> flow. <br /> 20.24.220 CFC Section 5003.5.3 added — H Occupancies. <br /> Section 5003.5.3 is added to read: <br /> 5003.5.3 H Occupancies. In "H" occupancies, all piping and tubing may be required to be <br /> identified when there is any possibility of confusion with hazardous materials transport tubing or <br /> piping. Flow direction indicators are required. <br /> 20.24.230 CFC Section 5003.13 added —Automatic Filling of Tanks. <br /> Section 5003.13 is added to read: <br /> 5003.13 Automatic Filling of Tanks. Systems that automatically fill flammable or combustible <br /> liquid tanks shall be equipped with approved overfill protection that sends an alarm signal to a <br /> location that is normally occupied during normal business hours and immediately stops the filling <br /> of the tank. The alarm signal and automatic shutoff shall be tested in a manner acceptable to the <br /> Page 18 of 35 <br />