My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
051915
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 12:11:05 PM
Creation date
5/13/2015 11:12:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/19/2015
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The applicant shall certify their acknowledgment of. and agreement to comply <br /> with both the City's franchise collector requirements and hauling & self-hauling regulations. <br /> The WMP fee; and <br /> 7. Th.: total area(in square feet) to be constructed or demolished. <br /> 9.21.040 Evaluation of WMP. <br /> A. The compliance official shall approve a WMP if the compliance official <br /> determines that all of the following conditions have been met.- <br /> 1. The WMP provides all of the information set forth in this chapter; and <br /> 2. The WMP demonstrates a diversion rate that meet.; or exceeds the diversion <br /> fequiremcnt. <br /> B. If the compliance official determines that the WMP fails to meet the diversion <br /> requirement, the compliance official shall immediately suspend processing the plan check for the <br /> project and either: <br /> I. Return the WMP application to the applicant marked "Denied," with r a;oni <br /> therefor, and retain a copy of the denial in the building division; or <br /> 2. Return the WMP to the applicant marked`Further Explanation Required," with a <br /> will not be permitted to begin any work and will be restricted from scheduling building <br /> inspections until the WMP is approved. <br /> C. •a <br /> of this code, no building. demolition, or similar permit shall be issued for any regulated project <br /> until the compliance official has approved the WMP. <br /> D. The compliance official shall approve or deny a WMP within 40-2 business days <br /> of the compliance officer's receiptnotice of electronic submittal for review of a complete WMP <br /> application. <br /> 9.21.050 Compliance with WMP. <br /> 1 A. • -- . e - . Submittal Requirements. Before the building division <br /> will all the scheduling of any final inspection issues a certificate of occupancy of on any <br /> regulated project, or before the building division issues the last certificate of occupancy for units <br /> within a regulated project that is part of a phased residential project, the applicant shall complete <br /> the WMP in the City's designated online waste management and tracking system. submit to the <br /> . . - To electronically submit the completed WMP for review by the compliance <br /> official, the applicant -shall include all offirst complete-the following: <br /> 1. Receipt:All documentation, such as weight tickets, specifying the weight and/or <br /> quantity of materials being recycled or disposed-from the franchise collector • - - . <br /> received die applicant's recyclable materials and solid waste showing the weight or volume of <br /> the materials. For materials for which weighing is not practical due to size or other <br /> . -. . . . . • - • - ..' ;and/or any other facility or agency shall <br /> be scanned and/or directly uploaded into the specified WMP; <br /> 2. Pictures and estimated quantities of all materials donated or salvaged. whether <br /> within the same project or used at another project shall be uploaded into the specified <br /> WMP•Whcre the franchise collector was unable to receive all or some recyclable materials, <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.