Laserfiche WebLink
ELECTRICAL PERMIT FEE WORKSHEET <br /> ITEM UNIT PRICE <br /> Filing fee for an Electrical Permit not included with $23.50 <br /> an associated Building Permit <br /> New Single-Family Dwelling Electrical Permit Fee $0.056 per square foot <br /> New Multi-Family Electrical Permit Fee $0.050 per square foot <br /> Electrical Plan Review Fee 25% of Electrical Permit fee, minimum one-hour, <br /> $98.48 <br /> Additional Plan Review(more than one initial recheck, Minimum one-hour, $98.48, or based upon review <br /> or for revisions to previously approved plans) time multiplied by the current reviewer rate, plus a <br /> $20.00 admin fee <br /> Appliances $4.75 each <br /> Busways $7.25 per 100 lineal feet <br /> General Circuits $5.25 per circuit <br /> Generators (under 10 kVA) $23.50 each <br /> Lighting Fixtures <br /> First 20 fixtures $1.10 each <br /> Fixtures exceeding 20 $0.73 each <br /> Miscellaneous Electrical Apparatus $18.20 each <br /> Motors or Generators <br /> Up to 1 HP (5 1 kVA) $4.75 each <br /> Up to 10 HP (5 10 kVA) $12.30 each <br /> Up to 50 HP (5 50 kVA) $24.60 each <br /> Up to 100 HP (5 100 kVA) $49.50 each <br /> Over 100 HP (> 100 kVA) $74.50 each <br /> Photo-Voltaic Systems, Residential <br /> Up to 15kW $150.00, plus one-hour plan review fee <br /> Over 15kW $400.00, plus $15 per additional kW above 15, and <br /> one-hour plan review fee <br /> Photo-Voltaic Systems, Non-Residential <br /> Up to 50kW $250 min, $16 per kW, plus two-hour plan review fee <br /> Over 50kW $12 per kW, plus $5 per additional kW above 50, and <br /> four-hour plan review fee <br /> Receptacles, Switches, Other Outlets <br /> First 20 outlets $1.10 each <br /> Outlets exceeding 20 $0.73 each <br /> Electrical panels <br /> Up to 199 amp (under 600 volts) $30.50 each <br /> Up to 999 amp (under 600 volts) $62.15 each <br /> 1000 amp or more (under 600 volts) $124.30 each <br /> Panelboards over 600 v $124.30 each <br /> Signs, marquees $24.60 each <br /> Private Spa or Swimming Pool $49.50 each <br /> Temporary Power (Pole or Pedestal) $23.50 each <br /> Temporary Power Distribution (for construction sites, $12.30 each <br /> seasonal lots, etc., per pole or pedestal) <br /> Transformers $66.50 each <br /> REVISED: July 1, 2013; March 1, 2013; January 1, 2013: March 1, 2012; January 1, 2012; Oct. 6, 2011; July 1, 2011; March 1, 2011; <br /> January 1, 2011; November 15,2010;August 1, 2010;July 1,2010; Feb 24, 2010;Jan 1, 2009;Oct 30,2008;July 1,2008;Jan 1,2008; <br /> Dec. 10,2007;Jan.3,2007;Jan 1,2007;Dec 1,2006;Nov 13,2006;July 14,2006;Jan 3,2006;July 14,2005;Nov 7,2004;July 2,2004; <br /> May 10,2004;March 3,2003;Jan 31,3004;April 12,2002,March 15,2002,Sept.6,2001,Jan.5,2001. <br /> Page 10 of 10 <br /> -- H.nd• . - if 11741- <br />