My WebLink
|
Help
|
About
|
Sign Out
B AND D EXCAVATION AND CONSTRUCTION
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
B
>
B AND D EXCAVATION AND CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2025 3:57:13 PM
Creation date
11/19/2025 3:53:49 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
B AND D EXCAVATION AND CONSTRUCTION
Contract Record Series
704-05
Munis Contract #
2026320
Contract Expiration
12/31/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley Avenue Soundwall Repair Project (REBID), CIP No. 18437 <br />Page 23 <br />CONTRACT <br />VALLEY AVENUE SOUNDWALL REPAIR (REBID) <br />PROJECT NO. 18437 <br />THIS CONTRACT is made and entered into this 21 day of October, 2025 by and <br />between B and D Excavation and Construction, ("Contractor"), whose address is 455 <br />Horn Av., Santa Rosa, CA 95407 and telephone number is 415-629-7673 and the CITY <br />OF PLEASANTON, a municipal corporation ("City"). <br />W I T N E S S E T H: <br />WHEREAS, the City has awarded to the Contractor a contract for VALLEY AVENUE <br />SOUNDWALL REPAIR (REBID), PROJECT NO. 18437 <br />, <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />1. Work to be Performed. In general, this work consists of repairs to existing <br />soundwalls including placement of new tube steel in drilled piers; connection to <br />existing precast concrete soundwall panels with expansion anchors in drilled <br />holes; sidewalk removal and replacement; landscape removal; and placement of <br />new wood cladding. <br />Said work is more particularly shown in the following documents which are on <br />file with the Engineering Department of the City and are incorporated herein by <br />this reference: <br />A.Approved Plans and Specifications entitled VALLEY AVENUE <br />SOUNDWALL REPAIR (REBID), PROJECT NO. 18437, and <br />addenda thereto, if any. <br />B.Contract Change Orders approved by the City Engineer, done in <br />accordance with the Standard Specifications. <br />C.The elements of the proposal submitted to the City by the <br />Contractor, which the City has accepted. <br />2. Compensation. The City shall pay the Contractor for work actually performed at <br />the unit prices set out in the Contractor's proposal to the City as set forth in <br />Exhibit A of this agreement and incorporated herein. The quantities of work <br />stated therein are estimates only; actual quantities will be measured for payment <br />in accordance with the specifications. <br />Docusign Envelope ID: EB4C2C19-356E-43A8-93B7-05268ACFEB92Docusign Envelope ID: 04A737C7-82FB-446F-A538-58E18C1C0CF6
The URL can be used to link to this page
Your browser does not support the video tag.