Laserfiche WebLink
ATTACHMENT 11 <br /> f P <br /> E St PFFRS <br /> TRANSPORTATION CONSULTANTS <br /> MEMORANDUM <br /> Date: November 10, 2009 <br /> To: Josh Pack, City of Pleasanton <br /> From: Kathrin Tellez and Matt Plumb, Fehr & Peers <br /> Subject: Pleasanton Gateway - Updated Transportation Assessment <br /> WC08 -26048 <br /> The Pleasanton Gateway project was envisioned to contain 714,075 square feet of development <br /> at buildout including: 588,500 square feet of office, a 65,000 square foot grocery store, 59,695 <br /> square feet of retail, and a 10 -pump gas station with an 880 square foot sales area. Fehr & <br /> Peers evaluated the potential off-site transportation impacts of that project, which were <br /> documented in Transportation Impact Study Pleasanton Gateway Retail /Office Plaza, June 2009 <br /> (June 2009 Study). <br /> At this time, the developer proposes to move forward with a modified retail center (Proposed <br /> Project) with the office components to be built at a later date. This memorandum presents the <br /> results of the transportation assessment for the modified retail component of the project, which <br /> differs from the retail component of the project analyzed in the June 2009 Study in the following <br /> aspects: <br /> • The new plan has an 8 -pump service station — the old plan had a 10 -pump service <br /> station. <br /> • The new plan has a 65,950 square -foot shopping center, including a 14,000 square foot <br /> pharmacy with drive - through, resulting in an additional 5,400 square feet of shopping <br /> center uses than the old plan <br /> • The grocery store in the new plan is 58,000 square feet with a potential 7,000 square foot <br /> expansion — the old plan had a 65,000 square -foot grocery store. For the purposes of <br /> this assessment, we have analyzed the grocery store as 58,000 square feet. <br /> This study compares the trip generation and distribution of prior project to the Proposed Project <br /> and provides an assessment of the operations of the intersection on Bernal Avenue between 1- <br /> 680 and Valley Avenue for the near -term condition with the Proposed Project. <br /> ANALYSIS SUMMARY <br /> The results of this assessment indicate that the Proposed Project would generate significantly <br /> less traffic than the project analyzed in the June 2009 report. Trip distribution patterns would also <br /> shift, as the retail components of the project are expected to generated more traffic from the local <br /> area (to serve local shopping needs), rather than attract regional traffic. <br /> Intersection operations (levels of service and vehicle queuing) on Bernal Avenue that directly <br /> influence project site access (1 -680 southbound and northbound ramps, Koll Center Drive, and <br /> Valley Avenue) were reevaluated with the reduction in Project traffic and shift in project trip <br /> distribution. Intersection levels of service and vehicle queuing were analyzed assuming modified <br /> full access to the site from Bernal Avenue (access remains unchanged to Koll Center Drive to the <br /> 100 Pringle Avenue, Suite 600 Walnut Creek, CA 94596 (925) 930 -7100 Fax (925) 933 -7090 <br /> www.fehrandpeers.com <br />