My WebLink
|
Help
|
About
|
Sign Out
6_Attachment 3
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
2022
>
08222022
>
6_Attachment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 4:43:17 PM
Creation date
8/16/2022 3:38:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2022
DESTRUCT DATE
15Y
Text box
ID:
1
Creator:
PLAN1
Created:
8/16/2022 3:38 PM
Modified:
8/16/2022 3:38 PM
Text:
ATTACHMENT 3
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ENGINEERING DEPARTMENT P. O. BOX 520, Pleasanton, CA 94566-0802 <br />Engineering Construction Services Landscape Architecture 200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br />(925) 931-5650 (925) 931-5680 (925) 931-5650 Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br /> <br /> <br /> <br /> <br /> COMMENT SUMMARY <br /> <br />Location: Pleasanton Summer Concert Series <br />Date: June 17, 2022 <br />Project: Lions Wayside and Delucchi Parks Master Plan Update, CIP No. 06716 <br />Subject: Public Outreach Event <br />Attendees: City (Matt Gruber, Sarah Hosterman, Zack Reda) <br /> <br /> <br />Below is a summary of the comments received from residents and other summer concert series visitors for <br />the proposed Lions Wayside and Delucchi Parks Master Plan Update. <br /> <br />The public outreach took place from 5:30-7:30pm at the Summer Concert Series held in Lions Wayside <br />Park on Friday June 17, 2022. <br /> <br />Staff presented the conceptual design from the master plan adopted in 2014 along with the 2022 updated <br />plan. Additionally, staff advertised for the community survey, the upcoming outreach meeting on June <br />22nd, and passed out flyers with a link to the survey and an image of the updated conceptual plan. Staff <br />spoke with approximately 50 people. <br /> <br />Below is a summary of comments regarding the project. <br /> <br />Design Comments <br />1. A 9-year-old said that they really like the new concept plan. <br />2. Pleasanton does not look good at all. The creek should be covered. Clayton and San Ramon are <br />outcompeting Pleasanton as far as aesthetics. <br /> <br />3. Install paving or grass in front of the bandstand. Do not install dirt or decomposed granite as it <br />tracks everywhere and creates a mess. <br /> <br />4. Leave some room in front of the band stand for the crowd to dance. <br />5. Maximize the lawn area. <br />6. Focus on having the correct design rather than the cost of the design. In the end, once the <br />project is built, nobody is going to remember how much it cost, they are just going to remember <br />how successful the design is. Sacrificing the design because of the cost is going to limit the <br />success of the park and is not in the best interest of future park users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.