Laserfiche WebLink
5. Prepare preliminary design plan and profile <br /> (scale 1"=100') and cost estimates for planning <br /> purposes for State Highway facilities including <br /> processing of preliminary plans to Department of <br /> Transportation for review and coordination with <br /> Mark Thomas & Co. Inc. and State Agency. (Based <br /> on utililizing existing planimetrics provided <br /> under Paragraph 3). <br /> <br /> $22,500 <br /> <br />6. Prepare preliminary utility relocation plan, <br /> including cost estimates. <br /> $10,000 <br /> S69,500 <br /> <br />Above estimate of work to be performed for the <br />following proposed improvements based on North <br />Pleasanton 1981 Volume 1 and Volume 2 and Volume 3 <br />Traffic Mitigations including updated information <br />furnished by the California Department of <br />Transportation and supplemental traffic reports <br />furnished by developers as necessary for submittal of <br />engineers report and is anticipated to include work <br />necessary for preparation of preliminary plans and <br />estimates for engineer's report and to include work <br />as described above through December 31, 1983. <br /> <br />After this date work determined to be necessary by <br />CITY will be performed as set forth under Paragraph <br />21 Extra Work. <br /> <br /> <br />