My WebLink
|
Help
|
About
|
Sign Out
RES 82221
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2012 8:35:35 AM
Creation date
3/1/2000 6:47:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/22/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Sewer Capacity. City agrees to reserve 196 single- <br />family dwelling unit equivalent sewer connections for <br />Developer's project as part of City's allotment at the <br />Dublin San Ramon Services District wastewater treatment <br />facility. Said connections shall run with the project as <br />approved by the City, not with the land. Said connections <br />shall not be transferable by Developer or its successors to <br />other land nor to another project on the same site, but may be <br />transferred along with the project and the land. Said <br />reservations are made in consideration of this agreement and, <br />said sewer connections shall be withheld if the provisions <br />of this agreement are not met. <br /> <br />8. Termination. This agreement shall remain in effect for <br />a period of twenty-four (24) months from the date of approval <br />of the final map unless extended on terms mutually acceptable <br />to the parties. <br /> <br /> In the event all units within the project have not been <br />built or are not under actual construction at the termination <br />of this agreement those units not built or not under actual <br />construction shall be subject to the growth management ~d <br />related procedures of the City in effect at that time. Any <br />building permits issued for units not under construction shall <br />be automatically revoked, provided the City refunds any fees <br />which may have been paid for said units' building permits. <br />Such units not built or units not under construction shall <br />also be subject to all fees and charges then applicable to <br />new residential construction and shall be considered by the <br /> <br />-9- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.