Laserfiche WebLink
7. Sewer Capacity. City agrees to reserve 196 single- <br />family dwelling unit equivalent sewer connections for <br />Developer's project as part of City's allotment at the <br />Dublin San Ramon Services District wastewater treatment <br />facility. Said connections shall run with the project as <br />approved by the City, not with the land. Said connections <br />shall not be transferable by Developer or its successors to <br />other land nor to another project on the same site, but may be <br />transferred along with the project and the land. Said <br />reservations are made in consideration of this agreement and, <br />said sewer connections shall be withheld if the provisions <br />of this agreement are not met. <br /> <br />8. Termination. This agreement shall remain in effect for <br />a period of twenty-four (24) months from the date of approval <br />of the final map unless extended on terms mutually acceptable <br />to the parties. <br /> <br /> In the event all units within the project have not been <br />built or are not under actual construction at the termination <br />of this agreement those units not built or not under actual <br />construction shall be subject to the growth management ~d <br />related procedures of the City in effect at that time. Any <br />building permits issued for units not under construction shall <br />be automatically revoked, provided the City refunds any fees <br />which may have been paid for said units' building permits. <br />Such units not built or units not under construction shall <br />also be subject to all fees and charges then applicable to <br />new residential construction and shall be considered by the <br /> <br />-9- <br /> <br /> <br />