Laserfiche WebLink
EXHIBIT A <br /> <br /> To Contract Dated Jun~ 6, 1982, Between <br />The City of Pleasaaton and MacKay & Somps, Civil Engineers, Inc. <br /> <br /> Net construction % from <br /> cost Cu~ A-1974 <br /> <br /> ~,~ 10.25 <br /> ~ 5~.~ 8.52 <br />12 ~ I ,~.~ 7,~ <br /> <br /> W,~.~ 5.70 <br />11 I~,~.~ 5.~ <br /> <br />6 <br /> <br />CONSULTING ENGINEERING <br /> <br />0.01 0.05 0.1 05 I 5 10 50 100 <br /> <br />FIG. I. --CURVE A. MEDIAN COMPENSATION FOR BASIC SERVICES EXPRESSED <br />AS A PERCENTAGE OF CONSTRUCTION COST FOR PROJECTS OF <br />ABOVE-AVERAGE COMPLEXITY (1974) <br /> <br /> <br />