My WebLink
|
Help
|
About
|
Sign Out
RES 82377
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2012 11:46:32 AM
Creation date
3/1/2000 5:06:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/28/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ll. (a) PGandE shall not be responsible for any delay inconstruction <br />of the Gas Facilities resulting from shortage of labor or materials, strikes, <br />labor disturbance, war, riots, weather conditions, governmental rule, regula- <br />tion or order, including orders or judgments of any court or commission, <br />delays in obtaining necessary rights of way, act of God, or any cause of con- <br />dition of like or unlike characteristic which is beyond the control of PGandE. <br />PGandE shall have the right, in the event it is unable to obtain supplies, <br />materials or labor for all of its construction requirements, to allocate mate- <br />rials and labor to construction projects which, in its sole discretion, it <br />deems most important to serve the needs of its customers and delay in construc- <br />tion hereunder resulting from such allocation shall be deemed a cause beyond <br />PGandE's control. <br /> <br /> (b) In the event that City or Developer has not completed its <br />obligations under this agreement within twelve (12) months foilowing the date <br />of this agreement, and PGandE is unable to proceed hereunder, PGandE shall <br />have the right to terminate and/or supersede this agreement upon thirty (3U) <br />days' written notice to City and Developer and calculate any refundable or <br />nonrefundable amounts that may be due based on that portion of the Gas Facili- <br />ties then completed, utilizing the estimated costs developed by PGandE for <br />this agreement. The superseding agreement, if any, shall be in the same form <br />as this agreement, be executed by all parties hereto and shall provide that <br />costs be allocated to the portion of the Gas Facilities then completed, if any, <br />consistent with those costs estimated by PGandE for this agreement. <br /> <br /> (c) If this agreement is terminated as set forth above, <br />Developer further agrees to reimburse PGandE for any engineering, surveying, <br />right of way acquisition and other associated expenses incurred by PGandE. <br /> <br />4: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.