My WebLink
|
Help
|
About
|
Sign Out
RES 82446
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:20:35 PM
Creation date
2/29/2000 5:52:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental engineers, scientists. <br />p~anners, & management Consultants <br /> <br />September 16, 1982 <br /> <br />CAMP DRESSER & McKEE INC. <br /> <br />710 South Broadway. Suite 201 <br />Walnut Cleek. Cai~lornla 94596 <br />415 933-2900 <br /> <br />Mr. Robert L. Warnick <br />Director of Public Works <br />City of Pleasanton <br />200 Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Foothill Reservoir <br /> <br />Dear Bob: <br /> <br />In response to your request we are pleased to submit this proposal for pre- <br />paring the preliminary and final design of the proposed Foothill Reservoir. <br /> <br />PURPOSE <br /> <br />The CDM report of December 1981, "A Water Distribution and Supply Study of <br />the North Central and the North West Portions of the Lower Pressure Zone" <br />identified water system improvements that will be needed in order to pro- <br />vide adequate flows and pressures within the north central and north west <br />as these areas develop. <br /> <br />One of the most needed improvements identified in the December 1981 report <br />is a reservoir at the Foothill site, see Figure 1. The recommended size of <br />this reservoir is from 5 to 8 million gallons (mg); the larger the better. <br />This site was analyzed by CDM in 1974 and plans for a 3.0 mg prestressed <br />concrete reservoir were prepared. Land at the site was acquired by the <br />City in 1979. <br /> <br />SCOPE OF WORK <br /> <br />In view of the above described conditions, CDM proposes to perform the fol- <br />lowing services: <br /> <br />Phase One Investigation <br /> <br />Task 1 - Review Previous Information <br /> <br />ing but not limited to, topographic data for the i a, <br />geologic and soils data, and the 1974 design for a 3.0 mg concrete reser- <br />voir. <br /> <br />Task 2 - Geotechnical Analysis <br /> <br />In August 1969 a foundation invest'igation was performed for two reservoir <br />locations in the vicinity of the proposed Foothill site. On the basis of <br /> SEP 1 ? lg82. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.