My WebLink
|
Help
|
About
|
Sign Out
RES 82480
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:06:09 PM
Creation date
2/29/2000 5:43:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/13/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q. In accordance with the Class C rates of Schedule LS-1, <br />or such other schedules as may hereafter be applicable for service to such <br />a street lighting system, City shall be responsible for the monthly service <br />charge for all street lighting, including the continuing additional monthly <br />payment for the special equipment furnished by PGandE. <br /> <br /> II. General Terms and Conditions <br /> <br /> A. PGandE will not be required to make electric refunds <br />hereunder until all additional charges which may become due under <br />Section II.D. have been determined, and PGandE may, at its option, apply <br />any refunds which may become due against such charges. <br /> <br /> B. For engineering reasons, transformers and switch <br />installations may be surface mounted. The transformer required for the <br />street lighting service facilities is to be subsurface mounted. <br /> <br /> C. City and Developer agree that in any transaction for the <br />sale or lease of property within Tract 4788 in the District, they will <br />reserve the right to grant to PGandE all necessary permanent rights of way <br />and easements for the Electric and Street Lighting Service Facilities and <br />Electric Substructures. <br /> <br /> D. It is expressly understood and agreed that as the actual <br />construction in Tract 4788 within the District takes place, PGandE may make <br />changes or modifications to that portion of the then unoccupied portion of <br />the Electric Substructures as shown on Exhibit "A" that PGandE determines <br />in its sole discretion are required to provide adequate service therein, and <br />such changes or modifications shall not be deemed a material departure from <br />this agreement and Developer and its successors in interest shall be and <br />remain obligated to pay for the completion of the Electric Substructures as <br />so modified; provided, however, that Developer shall not be obligated to <br /> <br /> 8: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.