My WebLink
|
Help
|
About
|
Sign Out
RES 82480
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:06:09 PM
Creation date
2/29/2000 5:43:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/13/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. PGandE will utilize Electric Substructures valued at <br />$30,728 to provide electric service as shown on the attached Exhibit "A." <br /> <br /> H. The Electric Substructures to be installed pursuant to <br />paragraph I.A. above are designed to meet estimated loads within Tract 4788 <br />in the District as represented by the City and Developer to PGandE. <br /> <br /> I. PGandE will complete the installation of the Electric <br />Facilities to the extent necessary to provide electric service when detailed <br />knowledge of the exact loads or service locations within Tract 4788 in the <br />District are made known to PGandE. <br /> <br /> J. PGandE shall not be obligated to utilize the Electric <br />Substructures to supply electric service to the City, Developer or owners of <br />individual lots in Tract 4788 in the District or other applicants except as <br />provided in Section I.K. <br /> <br /> K. It is not anticipated that two or more enterprises, as <br />defined in Rule 15.2, Section E, will initially request service in Tract 4788 <br />in the District. PGandE is willing, however, to install, own and operate the <br />Electric Facilities and the Electric Substructures as required under the <br />Exceptional Cases provisions of Rule 15.2, Section D.3, until such time as <br />two or more enterprises in Tract 4788 in the District have made application <br />for electric service with sufficient revenue-prodUcing electric equipment as <br />defined in Section I.N. that would warrant the installation of the Electric <br />Facilities by PGandE under Rule 15.2, or such other electric extension rule <br />as may then be applicable. Under the Exceptional Cases provision, PGandE <br />will, in accordance with this agreement, complete the installation of the <br />Electric Facilities and Electric Substructures required to furnish service <br />on an interim basis, the cost of which shall be paid by the City and in <br />advance of installation. <br /> <br /> 5: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.