My WebLink
|
Help
|
About
|
Sign Out
RES 82480
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:06:09 PM
Creation date
2/29/2000 5:43:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/13/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COPIES <br />//' DIVISION <br />/ / DEVELOPER <br />/ / CONTROL BUREAU <br />/ / DISTRICT <br /> <br />PACIFIC GAS AND ELECTRIC COMPANY <br />AGREEMENT FOR UNDERGROUND LINE EXTENSION WITHIN <br />· NEW COMMERCIAL OR INDUSTRIAL DEVELOPMENT <br /> <br />REFERENCE <br /> <br />Underground Extension Rule is attached and made a part hereof, to make electric service available within that certain <br />parcel or tract of land which Developer has or intends to improve or subdivide and which is situated in <br /> <br /> , County of , State of California, <br /> <br />known as Such electric service shall be made available within the <br />parcel or tract of land by means of an underground electric distribution system and related facilities, including any <br />required extension up to but not exceeding 200 feet in length outside the boundaries of the parcel or tract of land <br />(Distribution System), as delineated on PGandE's plans and specifications attached and made a part hereof. <br /> <br /> 2. PGandE will, at its expense, subject to the terms and conditions of this agreement and in accordance <br />with Section B.2 of the Underground Extension Rule, complete the Distribution SyStem as required to serve permanently <br />installed electrtc equipment wi thin the development. <br /> <br /> 3. Developer will, as provided in Section B.1 of the Underground Extension Rule, and in accordance with <br />PGandE's plans and specifications: <br /> <br /> (a) Perform (or arrange for the performance of) all necessary excavating and backfilling, including <br /> furnishing of any imported backfill material required. <br /> <br /> (b) Furnish and install (or arrange for the installation of) any conduit and other substructures, <br /> including but not limited to transformer pads, vaults, or enclosures. <br /> <br /> (C) Convey to PGandE such conduit and other substructures installed hereunder by the Developer free <br /> and Clear of all liens and encumbrances by good and sufficient deed or deeds. <br /> <br /> (d) Pay PGandE prior to any construction by PGandE $ (Reimbursement) which is PGandE's <br /> estimate of the installed cost of conduit and other substructures, if any, installed at PGandE's <br /> expense in conjunction with a previous extension in anticipation of Developer's current request <br /> for an extension. <br /> <br /> 4. PGandE will pay the Developer $ which is PGandE's estimate of the installed cost of that <br />portion of the Conduit and other substructures installed by DevelOper hereunder, if any, required by PGandE in antici- <br />pation of future extensions. In the event the Developer arranges for the installation by PGandE of the conduit and <br />other substructures required hereunder and PGandE also installs certain conduit or other substructures in anticipation <br />of future extensions, the Developer will not be charged for any conduit or other substructures installed by PGandE in <br />anticipation of future extensions. <br /> <br /> 5. As provided in Section C of the Underground Extension Rule, the amount of $ (Refundable <br />Amount) will be subject to refund for a period of three (3) years from the date PGandE is first ready to provide <br />service from the Distribution System, as such date is established in PGandE's records. The Refundable Amount is the <br />total of (a) the Reimbursement and {b) PGandE's estimate of the installed cost of the conduit and other substructures <br />to be installed and deeded to PGandE in accordance with Section 3 hereof, exclusive of the cost of vaults or enclosures <br />designed to accommodate transfoPmers that will supply three-phase service and conduit or other substructures installed <br />in anticipation of future extensions. PGandE will notify the Develeper of the date service is first made available. <br /> <br />6. 'PGandE will make refund payments to the Developer, without interest, as follows: <br /> <br />(a) At the end of the first 12-month billing period following the date PGandE is first readyto provide <br /> service from the Distribution System, the total charges billed to customers for electric service <br /> furnished directly from the Distribution System, as established in PGandE's records, will be com- <br /> puted as a percentage of the total estimated cost of the Distribution System then installed. The <br /> amount of refund payment to the Developer will be that same percentage of the Refundable Amount. <br /> <br />(b} If the entire Refundable Amount is not eligible for a refund payment at the end of the firs~ <br /> 12~month billing period, the same computation will be made again at the end of the second 12-month <br /> billing period and a refund payment will be made based upon the amount by which the total refund <br /> payment then due exceeds the amount already refunded. <br /> <br />(c) If necessary, the same percentage calculation will be made for the third 12-month billing period <br /> and a final refund payment will be made, based upon the 'amount by which the total refund payment <br /> then due exceeds the amount already refunded. <br /> <br />52-3183 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.