My WebLink
|
Help
|
About
|
Sign Out
RES 83539
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2012 12:22:25 PM
Creation date
2/5/2000 12:21:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/6/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10: Increased energy consumption will <br /> of site activities and ~rojected <br /> <br />11. <br /> <br />12. <br /> <br />Significant Effect: <br />occur as the result <br />cormmute trips. <br /> <br />Finding: Provisions for reducing automobile commuting <br />encouraging alternative means of transportation will <br />reduce vehicle miles travelled and energy consumption. <br /> <br />and <br /> <br />Facts: The developers are required to provide for a <br />program of coordinated, alternative transportation systems <br />for employees throughout the site, including vanpooling, <br />carpooling, and alternative work hours. <br /> <br />Finding: IncorDoration of solar energy measures in building <br />design will reduce energy consumption. <br /> <br />Facts: The utilization of passive and active solar ener%y <br />measures will be required for all buildings to the maximum <br />extent feasible. <br /> <br />Finding: Economic and social considerations make the <br />reduced scale or "no Project" alternatives, which would <br />result in reduced energy consumption infeasible. <br /> <br />Facts: The scale of the oroject is necessary in maintaining <br />the marketability of the site in order to provide increased <br />employment opportunities to the local community and to <br />increase the tax base of the City. <br /> <br />Significant Effect: Water supply requirements will exceed <br />existing distribution capacity. <br /> <br />Finding: The required water supply an~ distribution system <br />facilities will be constructed in conjunction with develop- <br />ment, mitigating any impact. <br /> <br />Facts: The developers are required to restrict site <br />development until adequate water supplies facilities and <br />lonE range requirements have been determined to be adequately <br />achieved, <br /> <br />SiRnificant Effect: Project uses would generate sewage <br />effluent beyond capacity available to the site. <br /> <br />'Finding: Project conditions miti%ate potential impacts. <br /> <br />Facts: Building-by-buildin~ approval process ensures <br />control over capacity: conditions guarantee no guarantee <br />of sewer capacity is included in the aDDroYal. <br /> <br />Finding: Additional capacity would mitigate impacts. <br /> <br />Facts: Expanded facilities are being discussed by <br />many responsible agencies: an EIR would be required <br />before any expansion could be made. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.