Laserfiche WebLink
10: Increased energy consumption will <br /> of site activities and ~rojected <br /> <br />11. <br /> <br />12. <br /> <br />Significant Effect: <br />occur as the result <br />cormmute trips. <br /> <br />Finding: Provisions for reducing automobile commuting <br />encouraging alternative means of transportation will <br />reduce vehicle miles travelled and energy consumption. <br /> <br />and <br /> <br />Facts: The developers are required to provide for a <br />program of coordinated, alternative transportation systems <br />for employees throughout the site, including vanpooling, <br />carpooling, and alternative work hours. <br /> <br />Finding: IncorDoration of solar energy measures in building <br />design will reduce energy consumption. <br /> <br />Facts: The utilization of passive and active solar ener%y <br />measures will be required for all buildings to the maximum <br />extent feasible. <br /> <br />Finding: Economic and social considerations make the <br />reduced scale or "no Project" alternatives, which would <br />result in reduced energy consumption infeasible. <br /> <br />Facts: The scale of the oroject is necessary in maintaining <br />the marketability of the site in order to provide increased <br />employment opportunities to the local community and to <br />increase the tax base of the City. <br /> <br />Significant Effect: Water supply requirements will exceed <br />existing distribution capacity. <br /> <br />Finding: The required water supply an~ distribution system <br />facilities will be constructed in conjunction with develop- <br />ment, mitigating any impact. <br /> <br />Facts: The developers are required to restrict site <br />development until adequate water supplies facilities and <br />lonE range requirements have been determined to be adequately <br />achieved, <br /> <br />SiRnificant Effect: Project uses would generate sewage <br />effluent beyond capacity available to the site. <br /> <br />'Finding: Project conditions miti%ate potential impacts. <br /> <br />Facts: Building-by-buildin~ approval process ensures <br />control over capacity: conditions guarantee no guarantee <br />of sewer capacity is included in the aDDroYal. <br /> <br />Finding: Additional capacity would mitigate impacts. <br /> <br />Facts: Expanded facilities are being discussed by <br />many responsible agencies: an EIR would be required <br />before any expansion could be made. <br /> <br /> <br />