Laserfiche WebLink
Energy. <br /> <br />Significant Effect. Increased energy use on site <br />during construction and operation. <br /> <br />Finding. The mitigation measure incorporated <br />into the Project to mitigate energy use will <br />substantially lessen the effect. <br /> <br />Fact. Condition 18 requires that all buildings <br />in the Project shall employ solar energy to the <br />maximum extent economically feasible. <br /> <br />a.3 Fact. Economic realities encourage installation <br /> of energy efficient machinery. <br /> <br />Significant Effect. Potential large transportation <br />energy consumption. <br /> <br />Finding. The recommended mitigation measure <br />incorporated into the Project to cause a re- <br />duction in energy consumption will substantially <br />lessen the effect. <br /> <br />Fact. The Traffic Conditions will reduce vehi- <br />cle miles travelled and result in a lessened use <br />of energy. <br /> <br />VII . <br /> <br />Geology. <br /> <br />Significant Effect. Erosion during construction <br />stage, on-site and at channel improvements. <br /> <br />Finding. The mitigation measures incorporated <br />into the Project to control erosion will <br />substantially lessen the effect. <br /> <br />a.2 <br /> <br />Fact. Condition No. 63 requires Developer to <br />restrict grading to non-rainy periods and sta- <br />bilize erodible slopes. Condition No. 64 <br />requires Developer to provide and maintain sedi- <br />ment basins during construction. Condition <br />No. 65 requires Developer to submit erosion and <br />drainage control plans and a grading and drain- <br />age plan. <br /> <br /> <br />