My WebLink
|
Help
|
About
|
Sign Out
RES 83501
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2012 12:39:49 PM
Creation date
2/4/2000 11:54:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/8/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Energy. <br /> <br />Significant Effect. Increased energy use on site <br />during construction and operation. <br /> <br />Finding. The mitigation measure incorporated <br />into the Project to mitigate energy use will <br />substantially lessen the effect. <br /> <br />Fact. Condition 18 requires that all buildings <br />in the Project shall employ solar energy to the <br />maximum extent economically feasible. <br /> <br />a.3 Fact. Economic realities encourage installation <br /> of energy efficient machinery. <br /> <br />Significant Effect. Potential large transportation <br />energy consumption. <br /> <br />Finding. The recommended mitigation measure <br />incorporated into the Project to cause a re- <br />duction in energy consumption will substantially <br />lessen the effect. <br /> <br />Fact. The Traffic Conditions will reduce vehi- <br />cle miles travelled and result in a lessened use <br />of energy. <br /> <br />VII . <br /> <br />Geology. <br /> <br />Significant Effect. Erosion during construction <br />stage, on-site and at channel improvements. <br /> <br />Finding. The mitigation measures incorporated <br />into the Project to control erosion will <br />substantially lessen the effect. <br /> <br />a.2 <br /> <br />Fact. Condition No. 63 requires Developer to <br />restrict grading to non-rainy periods and sta- <br />bilize erodible slopes. Condition No. 64 <br />requires Developer to provide and maintain sedi- <br />ment basins during construction. Condition <br />No. 65 requires Developer to submit erosion and <br />drainage control plans and a grading and drain- <br />age plan. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.