Laserfiche WebLink
II. <br /> <br />EXHIBIT "B" <br /> <br />IN-TRACT PHASE I <br /> <br />Total Lineal Feet of improved new street <br /> <br />CONCRETE <br /> 1. <br /> 2. <br /> <br />1 each double 12' x 10' RCB <br /> <br />1 each double 12' x 9' RCB incl. <br />cushion, etc. <br /> <br />1 each triple 12' x 11' RCB <br /> <br />34,946 L.F. (6.6 miles). <br /> <br />excavation, compaction, <br /> <br />4. 1 each triple 12' x 12' RCB <br /> <br /> 7. <br /> to back of curb and gutter incl. <br /> <br />SURVEY MONUMENTS <br /> <br /> 1. 39 each Standard City Monument <br />WATER <br /> <br />72,603 S.F. 4" PCC sidewalk <br /> <br />52,752 S.F. 6" sidewalk and driveway <br /> <br />11,166 L.F. wedge thickening of sidewalk where adjacent <br /> additional excavation <br /> <br />16" D.I.P. water line <br /> <br />12" D.I.P. water line <br /> <br /> 12" A.C.P. water line <br /> <br />1. 4,698 L.F. <br />2. 1,152 L.F. <br />3. 22,289 L.F. <br />4. 57 each 10" <br />5. 33 each 12" <br /> <br />water service, incl. valve and valve boxes <br />water service, incl. valve and valve boxes <br /> <br /> 6. 101 each Standard fire hydrant, incl. tee, valve, <br /> piping, etc. <br /> <br /> 7o 63 each 12" butterfly valve, incl. valve box <br /> <br /> 8. 11 each 16" butterfly valve, incl. valve box <br /> <br /> 9. 1 each air release valve, 16" main <br /> <br />10. 3 each air release valve, 12" main <br /> <br />-1- <br /> <br /> <br />