Laserfiche WebLink
K - GENERAL INCIDENTIAL EXPENSES <br /> <br />2. <br /> <br />3. <br /> <br />4 <br /> <br />5 <br /> <br /> 6 <br /> <br /> 7 <br /> <br /> 8 <br /> <br /> 9 <br /> <br /> 10 <br /> <br /> 11/~ <br />'12. <br /> 13. <br /> <br /> 14. <br /> <br />15. <br /> <br />Soil Engineering <br /> <br />Landscape Architecture <br /> <br />Traffic Signal Design <br />Preliminary Design <br />Utility System Design <br />Engineering & Surveying <br />Printing of Bidding Plans <br /> <br />City Water Main Fee <br /> <br />City Plancheck & Inspection Fee <br />Loan Fees <br /> <br />Loan Acquisition'Legal Fees <br />Bonds, Insurance & Taxes <br />Interest Expense <br /> <br />Management Expenses <br /> <br />PG&E Fees <br /> <br />$ 29392.84 <br />24.799.21 <br /> <br /> 8.897.00 <br /> 65~921.20 <br /> 15115.10 <br /> 317,569.08 <br /> 5.610.61 <br /> 45000.00. <br /> 159328.00 <br /> <br /> 190.691.85 <br /> 45683.43 <br /> 83 165.93 <br /> 349.699.36 <br /> 466,000.00 <br /> 74,532.00 <br /> <br />TOTAL $1,881,405.61 <br /> <br /> <br />