Laserfiche WebLink
C <br /> <br />- CONSTRUCTION CONTRACT NO. <br /> GRADEWAY <br /> <br />1. Trench Type 1 <br />2. Trench Type 2 <br />3. Trench Type 3 <br />4. Trench Type 4 <br />5. Trench Type 5 <br />6. Trench Type 6 <br />7. Trench Type 7 <br />8. Trench Type 8 <br />'9. 'Trench Type 9 <br />10. Trench Type 10 <br />11. PG&E 6" Duct <br />12. PG&E 4" Duct <br />13. PG&E 3" Duct <br />14. PG&E 2" Duct <br />15. PT&T 4" Duct <br /> <br />3: UTILITY STREET CROSSINGS <br /> <br />65 if $2.90 <br />1,035 If 2.95 <br />380 if 5.20. <br />70 If 8.60 <br />150 if 3.40 <br />100 if 9.80 <br />801f 8.05 <br />195 if 4.30 <br />235 If 6.65 <br />190 if 8.25 <br />495 if 2.60 <br />2,525 if 1.35 <br />590 If 1.15 <br />2,155 If .90 <br />5,630 if 1.50 <br /> Subtotal <br /> <br />$ 188.50 <br /> 3,053.25 <br /> 1,976.00 <br /> 602.00 <br /> 510.00 <br /> 980.00 <br /> 644.00 <br /> 838.50 <br /> 1,562o75 <br /> 1,567.50 <br /> 1,287.00 <br /> 3,408.75 <br /> 678.00 <br />1,939.50 <br />8,445.00 <br />$27,681.25 <br /> <br />CO-1 - Overtime & Extra Trenches <br /> <br /> LS <br />TOTAL <br /> <br />$19,738.25 <br /> <br />$47,419.50 <br /> <br /> <br />