Laserfiche WebLink
A - CONSTRUCTION CONTRACT NO. <br /> GRADEWAY Continued ... <br /> <br />31. Signs & Barricades <br />32. 6" Driveways <br /> <br />33. 12" RCP C13 <br />34. 12" RCP C15 <br />35. 15" RCP C13 <br />36. Lug Connection <br />37. 36" RCP <br />38. 42" RCP <br /> <br />39 Insurance & Bonds <br /> <br />1: STREET IMPROVEMENTS <br /> <br />LS LS <br />33,700 sf $2.00 <br />116 if 17.25 <br />711 if 19.50 <br />254 if 20.00 <br />4 ea 300.00 <br />30 if 50.00 <br />54 if 60.00 <br />LS LS <br /> <br />oCO-i/! <br /> <br /> CO-2 <br /> CO-3 <br /> CO-4 <br /> CO-5 <br /> CO-6 <br /> CO-7 <br /> CO-8 <br /> <br />Subtotal <br /> <br />Revise sewer manholes <br /> <br />Extra workin Hopyard Rd. <br />Decrease work in Hopyard Rd. <br />Change in insurance cost <br />Revision to base pavement section <br />Delete bid item 6 <br />Extra concrete repair <br />Driveway cuts & pav~.ng cleanup <br /> <br />$ 4,000.00 <br />67,400.00 <br />2,001.00 <br />1,384.50 <br />5,080.00 <br />1,200.00 <br />1,500.00 <br />3,240.00 <br />16,541.15 <br /> <br />$1,779,850.00 <br /> <br /> 5,405.00 <br /> 7,130.00 <br /> <br /> (920.00) <br /> (12,179.00) <br /> <br /> 28,598.00 <br /> <br /> (169,000.00) <br /> 15,376.00 <br /> 13,160.21 <br /> <br />Total <br /> <br />$1,667,420.21 <br /> <br /> <br />